› contract for dredging and disposal of seabed materials
› payment dispute
› standby costs
› claim rejected
› adjudicator’s determination
› validity of
Administrative Law
› Substantial denial of natural justice
› determination based on matter not in dispute
› failure to provide an opportunity to make submissions on a matter highly significant to adjudicator’s determination
› determination quashed
Trans Australian Constructions Pty Limited v Nilsen (SA) Pty Ltd; Independent Fire Sprinklers (NT) Pty Ltd v Sunbuild Pty Ltd [2008] NTSC 46; (2008) 24 NTLR 15; A J Lucas Operations Pty Ltd v Mac-Attack Equipment Hire Pty Ltd and Another [2009] NTSC 48; (2009) 25 NTLR 1; Zurich Bay Holdings Pty Ltd v Brookfield Multiplex Engineering and Infrastructure Pty Ltd [2014] WASC 40; Brodyn Pty Ltd v Davenport and Another [2004] NSWCA 394; (2004) 61 NSWLR 421, followed.
Construction Contracts (Security of Payments) Act 2004 (NT) s 8, s 27, s 28(1)(a), s 28(2)(b) and (c), s 29(1), s 29(2)(b) and (c), s 33(1)(a) and (b), s 34(2)(a).
Case Details
Citation[2014] NTSC 20
CourtNTSC
JurisdictionNorthern Territory
Unlock so much more with Barrister AI
The full text is available to signed-in members, including the 6 later cases that cite this judgment.
2 of the 6 citing cases carry a classified treatment. How each court treated it is available to signed-in members.