Rights to use groundwater conferred by s 8(4)(a) of the Water Act 1989 (Vic) pursuant to a take and use licence under s 51 cannot be limited by the Planning and Environment Act 1987 or any planning scheme made thereunder, because neither contains an express intention to limit those rights as required by s 8(6). A planning permit is required for the land use associated with groundwater extraction (e.g., utility installation infrastructure), but the extraction of groundwater itself cannot be the subject of planning objection. Preliminary statements on the face of water licences are not 'conditions' within the meaning of s 8(6)(c).
The full text is available to signed-in members, including the 2 later cases that cite this judgment.