JUDICIAL REVIEW — Judicial review of council decision — Class 4 — Development consent and modification approval — Mixed-use development — Right of carriageway benefitting neighbouring site — Scope of s 4.17 Environmental Planning and Assessment Act 1979 (NSW) — Whether failure to consider likely impacts of development — Adequacy of consideration of impacts — Reliance on expert advice — Conditions of consent — Legal unreasonableness
ENVIRONMENT AND PLANNING — Development consent — Conditions — Whether condition impermissibly deferred consideration of mandatory matter — Condition requiring future engineering design and approval — Whether condition creates legal uncertainty
ENVIRONMENT AND PLANNING — Development standards — Height of buildings — cll 4.3 and 4.6 Sydney Local Environmental Plan 2012 — Concept development consent — Subsequent detailed development application — Calculation of “ground level (existing)” — Whether clause 4.6 Sydney Local Environment Plan 2012 variation request legally sufficient
ENVIRONMENT AND PLANNING — Concept development consent — Effect of s 4.24(2) Environmental Planning and Assessment Act 1979 (NSW) — Consistency between concept consent and development concept
Quick Take
1A consent authority satisfies its obligation under s 4.15(1)(b) EPA Act to consider likely impacts on a third party's right of carriageway where the assessment report identifies the impacts, the authority has professional engineering opinion that access can be retained, and conditions are imposed requiring detailed design approval prior to demolition — the adequacy of the response is not justiciable in judicial review.
2A condition requiring submission and approval of detailed engineering designs prior to demolition (here, Condition 38) does not constitute impermissible deferral of a fundamental matter where the consent itself determines the outcome (retention of access) and the condition specifies objective criteria and a clear approval mechanism; leaving detailed construction design to a later stage is consistent with the statutory scheme.
3'Ground level (existing)' as defined in SLEP 2012 means the existing ground level of a site, not the lowest excavated basement level; the definition of 'basement' (space 'below ground level (existing)') and 'ground level (finished)' (excluding excavation for basements) confirm this textual construction, and an extrapolation methodology from survey points is appropriate for previously developed sites with basements.