Requirement
CurrentRequirement
Requirement Requirement
1. Modify gauge units by replacing the diaphragm and capillary tube assembly P/N 45010 with a new assembly P/N 45010. The new assemblies are identified with a 1/4 in. wide white band painted on the capillary tube adjacent to the solder joint of the tube to the diaphragm.
2. Provide an overboard drain line from the fuel pressure gauge vent connection on each gauge unit installation. The line shall be terminated at a point where the discharge of fuel will not constitute a fire hazard and where fumes will not enter personnel compartments.
Research tools for this sectionSubscription
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.