Background
CurrentBackground
Background Background
Incorporation of Shorts SB SD360-21-21 Original Issue resulted in wiring changes that inhibited the generator failure slave relay from being energised, this resulted in both load shedding busbars not being able to be brought back on line when override is selected.
Rewiring in accordance with Revision 1 of the service bulletin restores correct operation of the generator failure slave relay.
Research tools for this sectionSubscription
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.