Background
In forceBackground
Background Background
Inspection of the wing to fuselage attachment is necessary to ensure the continued integrity of the structure.
Amendment 1 added an in-situ visual inspection of the fittings due to reports to the Authority of cracks developing within times significantly less than that required by the DGAC AD and the manufacturer.
Amendment 2 provides terminating action.
The original issue of this Airworthiness Directive became effective on 2 March 1995. Amendment 1 of this Airworthiness Directive became effective on 22 June 1995.
Sign in to see bill, explanatory material, and regulations and instruments
Research tools for this sectionSubscription
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.