s 110
In forceTransitional—buildings and structures in existence when airport lease first granted
Part 5Land use, planning and building controls
Division 5Building control
Subdivision DCertificates of compliance
110 Transitional—buildings and structures in existence when airport lease first granted
(1)
This section applies to a building, structure, earthworks, engineering works, electrical works, hydraulic works or eligible alteration on an airport site that was completed before the time when an airport lease for the airport was granted under the Airports (Transitional) Act 1996.
(2)
Sections 106, 108 and 109 do not apply in relation to the building, structure, earthworks, engineering works, electrical works, hydraulic works or eligible alteration, as the case requires, throughout the 180‑day period beginning when the lease is granted.
Research tools for this sectionPro
The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.