Use of current datum
42 Use of current datum
For the purposes of this Act, after the changeover time, for a title or instrument set out in the table, the position on the surface of the Earth of a point, line or area set out in the table is to be described by reference to the current datum, and the relevant title or instrument may be annotated accordingly:
Points, lines and areas | ||
|---|---|---|
Item | Title or instrument | Point, line or area |
1 | a petroleum exploration permit | the permit area of a petroleum exploration permit granted after the changeover time |
2 | a petroleum retention lease | the lease area of a petroleum retention lease granted after the changeover time |
3 | a petroleum production licence | the licence area of a petroleum production licence granted after the changeover time |
4 | an infrastructure licence | the licence area of an infrastructure licence granted after the changeover time |
5 | a petroleum special prospecting authority | the authority area of a petroleum special prospecting authority granted after the changeover time |
6 | a petroleum access authority | the authority area of a petroleum access authority granted after the changeover time |
7 | a pipeline licence | the route of a pipeline authorised by a pipeline licence granted after the changeover time |
8 | a greenhouse gas assessment permit | the permit area of a greenhouse gas assessment permit granted after the changeover time |
9 | a greenhouse gas holding lease | the lease area of a greenhouse gas holding lease granted after the changeover time |
10 | a greenhouse gas injection licence | the licence area of a greenhouse gas injection licence granted after the changeover time |
11 | a greenhouse gas search authority | the authority area of a greenhouse gas search authority granted after the changeover time |
12 | a greenhouse gas special authority | the authority area of a greenhouse gas special authority granted after the changeover time |
13 | any other instrument under this Act | a point, line or area set out in any other instrument made under this Act made after the changeover time |
A grant of a petroleum exploration permit, a petroleum retention lease or a petroleum production licence may be a grant by way of renewal—see section 11.
A grant of a greenhouse gas holding lease may be a grant by way of renewal—see section 11.
Sign in to see bill, explanatory material, and regulations and instruments
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.