2008 WCMG limit—general
3 2008 WCMG limit—general
3.1 Subject to clauses 4 and 5, the 2008 WCMG limit for a WCMG power station is the amount of electricity generated in 2008, worked out in accordance with Subdivision 2.3.1, less the amount of the 1997 eligible renewable power baseline (if any) for the power station.
3.2 However, for 2012:
the 2008 WCMG limit for a WCMG power station is half of the limit mentioned in subclause 3.1 for the power station; and
the 1997 eligible renewable power baseline for the WCMG power station is taken to be half of the baseline determined for the power station.
3.3 If the amount of electricity generated using waste coal mine gas was not measured in the manner provided for by these Regulations, the amount is to be estimated from the measurements that were made and worked out in accordance with Subdivision 2.3.1.
3.4 For the purpose of working out an amount of electricity generated in accordance with Subdivision 2.3.1, waste coal mine gas is to be treated as if it was an eligible energy source in 2008.