8
In forceFlood liability
Schedule 6Pond-based and tank-based aquaculture
Part 2Extensive pond-based aquaculture
Division 1Site location requirements
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
Sign in to see bill, explanatory material, and regulations and instruments
Research tools for this sectionSubscription
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.