17
CurrentPreloading works
Schedule 12Exempt development—Chapter 6
17 Preloading works
(1)
Preloading works for compression of soil before construction.
(2)
The development must not—
(a)
disturb soil or vegetation, except to the extent necessary to carry out the development, or
(b)
damage adjoining buildings or structures on the land or an adjoining lot, or
(c)
redirect the flow of surface water onto an adjoining lot.
(3)
Fill brought to the site must be appropriate fill.
Research tools for this sectionSubscription
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.