Development permitted with consent—generally
2.124A Development permitted with consent—generally
Development for the purposes of installing an EV charging unit may be carried out with consent if—
the unit does not obstruct the following—
vehicular, cyclist or pedestrian access to or from, or entry into, a building,
cyclist or pedestrian movement along a cycleway or footpath, and
the unit does not obstruct access to, or interfere with, a structure, device, fixture or equipment used for firefighting or fire protection, including a fire hydrant, and
for an advertising-enabled EV charging unit—
the unit is not installed on land in a residential zone, and
each screen or display of the unit—
complies with AS/NZS 4282:2019, Control of the obtrusive effects of outdoor lighting, and
if illuminated—is not animated, flashing or moving.
(Repealed)