Additional conditions—bridges, cranes, ship loaders, unloaders and bridges, conveyor systems, cranes, dry bulk storage silos, road and rail terminal facilities, ship loaders and unloaders, stacker-reclaimers, stackers, reclaimers, wharves and berthing infrastructure
23 Additional conditions—bridges, cranes, ship loaders, unloaders and bridges, conveyor systems, cranes, dry bulk storage silos, road and rail terminal facilities, ship loaders and unloaders, stacker-reclaimers, stackers, reclaimers, wharves and berthing infrastructure
This section applies to development that consists of the construction or installation of any of the following items—
a bridge used for a purpose other than a road,
a rail-mounted crane, crane rails for a rail mounted crane or a fixed crane,
a ship loader, unloader, or cargo handling facilities,
a dry bulk storage silo,
road and rail terminal facilities,
a stacker-reclaimer, stacker or reclaimer,
wharves and berthing infrastructure,
a conveyor system.
The development is subject to the condition that a certificate by a qualified engineer must be provided to the principal certifying authority, before the principal certifying authority carries out the final inspection, certifying that—
the item has been installed in accordance with the specifications for the design certified by a qualified engineer, and
the item is structurally adequate.