Information to be included in geothermal operations plan
14 Information to be included in geothermal operations plan
For section 67(2)(c) of the Act, a geothermal operations plan for a geothermal authority area must include the following information:
details of the operations to be conducted for the technical work summarised in the technical work program for the area;
a description of how the operations will be conducted and the persons who will conduct the operations;
plans of the proposed and (if applicable) current work sites for the operations, including buildings and infrastructure on the work sites;
descriptions and plans of proposed and (if applicable) current infrastructure associated with the operations in the geothermal authority area, including any road construction under section 42 of the Act;
details of the proposed restoration and rehabilitation of land if operations or geothermal activities conducted in the area are to cease permanently, and the anticipated cost of the restoration and rehabilitation.