Types of plans
60 Types of plans
(1) A well operations management plan is a plan, prepared by a permittee or licensee, that demonstrates to the
Minister that well activities will be appropriately managed over the entire life cycle of the well, including in relation to drilling, well construction, operation, re-entry, modification, decommissioning and the post-decommissioning period, to ensure that the risks to the integrity of the well are reduced to as low as is reasonably practicable.
(2) A field management plan is a plan, prepared by a licensee for a production licence, that demonstrates to the
Minister that the licensee has a strategic plan for the life cycle of the field that will provide for the maximum economic recovery of petroleum, and will return the optimal value of the resource, including the optimal value to the Territory, after taking into account good oilfield practice and any other relevant factor under this Act.
(3) A petroleum surface infrastructure plan is a plan, prepared by a licensee for a production licence, that demonstrates to the Minister that petroleum surface infrastructure on the licence area will be appropriately designed, built, operated and decommissioned to ensure that petroleum recovered under the licence will be appropriately managed from the point of extraction at the wellhead to the point of removal from the licence area in order to secure supply and to return the optimal value of the resource, including the optimal value to the Territory, after taking into account good oilfield practice and any other relevant factor under this Act.