120D
In forceRequirements for worker
Part 6Electrical installations
Division 7Roof space work
120D Requirements for worker
A worker must ensure, so far as is reasonably practicable, that the worker does not carry out work in the roof space of a building, or enter the roof space for the carrying out of work in another part of the building, unless—
(a)
the relevant electrical installation for the building is de-energised; or
(b)
a circumstance mentioned in section 120C(2) applies.
Maximum penalty—10 penalty units.
Research tools for this sectionSubscription
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.