3
In forceAmendment of clause 7.8.2 (Metering installation components)
Schedule 2Modification of application of National Electricity Rules for regulated stand-alone power systems
3 Amendment of clause 7.8.2 (Metering installation components)
Clause 7.8.2, after paragraph (a2)—
insert—
(a3) Despite paragraph (a), a type 4A metering installation may be installed for a connection point for a market generating unit or market bidirectional unit in, or connected to, a Queensland regulated SAPS. (a4) However, a type 4A metering installation may only be installed if— (1) the Queensland regulated SAPS comprises of, or is connected to, either only 1 market generating unit or only 1 market bidirectional unit; and (2) the amount of electricity supplied at the connection point over 12 months does not exceed 100 megawatt hours; and (3) the financially responsible market participant for the connection point is a market SAPS resource provider. (a5) For paragraphs (a3) and (a4), a Queensland regulated SAPS is a regulated SAPS located within either of the following areas— (1) the distribution area described in distribution authority no. D01/99, schedule 1; Note— The holder of distribution authority no. D01/99 is Ergon Energy Corporation. (2) the distribution area described in distribution authority no. D07/98, schedule 1. Note— The holder of distribution authority no. D07/98 is Energex Limited ACN 078 849 055. (a6) If paragraphs (a3) to (a5) are inconsistent with any other requirements in the National Electricity Rules in relation to a metering installation for a connection point for a market generating unit or market bidirectional unit in, or connected to, a Queensland regulated SAPS, paragraphs (a3) to (a5) prevail to the extent of the inconsistency.
Sign in to see bill, explanatory material, and regulations and instruments
Research tools for this sectionSubscription
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.