Daily drilling report
15 Daily drilling report
The holder of a GHG tenure must keep a report (a daily drilling report) for each day on which drilling of a GHG well is carried out under the tenure.
A daily drilling report for a GHG well must contain the following information about the drilling carried out on the day to which the report relates—
the identifying name of the well;
the tenure holder’s name and the tenure under which the well was drilled;
the type of drilling rig used;
a summary of the drilling operations carried out;
the depth in metres of the well at the end of the day’s drilling;
the size and type of drill bit used;
the drilling fluids and additives used;
the size and depth in metres of any casing inserted in the well;
the depth in metres of the top and bottom of each cemented interval in the well;
the results of any deviation surveys carried out in the well;
a description of any drill stem tests or other tests carried out in the well;
the type of any perforations in the well and the depth in metres of the top and bottom of the perforated intervals;
details of any squeeze cementing or cement plugging carried out;
a description of any cores or cutting samples taken;
any other information stated in the relevant direction for the report.
In this section—
deviation survey means a survey of the path of a GHG well that measures its direction in 3 dimensions.
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.