Facilities
3 Facilities
A vessel or structure is taken to be a facility for the purposes of this schedule while that vessel or structure—
is located at a site in the adjacent area; and
is being used, or prepared for use, at the site for any of the following purposes—
the recovery of petroleum, the processing of petroleum, or the storage and offloading of petroleum, or any combination of those activities;
the provision of accommodation for persons working on another facility, whether connected by a walkway to the other facility or not;
drilling or servicing a well for petroleum or doing work associated with the drilling or servicing process;
laying pipes for petroleum, including any manufacturing of the pipes, or doing work on an existing pipe;
the erection, dismantling or decommissioning of a vessel or structure mentioned in any of subparagraphs (i) to (iv);
another purpose related to offshore petroleum operations that is prescribed for the purpose of this subparagraph.
Subsection (1) applies to a vessel or structure—
whether it is floating or fixed; and
whether or not it is capable of independent navigation.
Subsection (1) has effect subject to subsections (6) and (7).
A vessel or structure used for a purpose mentioned in subsection (1)(b)(i) includes—
any wells and associated plant and equipment by means of which petroleum processed or stored at the vessel or structure is recovered; and
any pipe or system of pipes through which petroleum is conveyed from a well to the vessel or structure; and
any secondary line associated with the vessel or structure.
For subsection (1), a vessel or structure that is located offshore for the purpose of laying pipes as described in subsection (1)(b)(iv) is taken to be located at a site, despite the fact that the vessel or structure moves as the pipe laying process proceeds.
Despite subsection (1), a vessel or structure is taken not to be a facility for the purposes of this schedule if the vessel or structure is any of the following—
an offtake tanker;
a tug or an anchor handler;
a vessel or structure used for supplying a facility or otherwise travelling between a facility and the shore;
a vessel or structure used for any purpose such that it is declared by the regulations not to be a facility.
In deciding when a vessel or structure that has the potential to be used for 1 or more of the purposes mentioned in subsection (1)(b) is in fact being so used, the vessel or structure is taken—
to commence to be so used only at the time when it arrives at the site where it is to be so used and any activities necessary to make it operational at that site are begun; and
to cease to be so used when operations cease, and the vessel or structure has been returned either to a navigable form or to a form in which it can be towed to another place.
Each of the following is taken to be a facility for the purposes of this schedule—
a pipeline subject to a pipeline licence;
if a pipeline subject to a pipeline licence conveys petroleum recovered from a well without the petroleum having passed through another facility—the pipeline, together with—
the well and associated plant and equipment; and
a pipe or system of pipes through which petroleum is conveyed from that well to that pipeline.
In subsection (8)(b)—
facility does not include a pipeline.
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.