Duties of prime contractors and rail operators
82 Duties of prime contractors and rail operators
A prime contractor or rail operator must not transport a load that contains dangerous goods if the prime contractor or the rail operator knows, or ought reasonably to know, that—
the load is a placard load; and
the load is not appropriately placarded.
Maximum penalty—40 penalty units.
A prime contractor or rail operator must not transport a placard load if the prime contractor or the rail operator knows, or ought reasonably to know, that the placarding of the load is false or misleading in a material particular.Maximum penalty—40 penalty units.
A prime contractor or rail operator must not use a cargo transport unit that is placarded as if it contained a placard load if the prime contractor or the rail operator knows, or ought reasonably to know, that the cargo transport unit does not contain a placard load.Maximum penalty—40 penalty units.
However, subsection (3) does not apply if the placarding of the cargo transport unit complies with the requirements for the contents of the cargo transport unit in—
the ICAO technical instructions; or
the IMDG Code.
The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.