Taking water using particular existing overland flow works authorised
52 Taking water using particular existing overland flow works authorised
This section applies to the owner of land on which existing overland flow works are situated, other than works for taking only the overland flow water that may be taken under section 50(2)(a) to (e).
The owner may—
continue to use the existing overland flow works to take overland flow water for 1 year after the commencement of this plan; and
if the owner complies with section 51, further continue to use the works to take overland flow water.
In this section—
existing overland flow works includes works that—
are a reconfiguration of existing overland flow works (the original works); and
do not increase the average annual volume of water taken above the average annual volume taken using the original works.
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.