396
CurrentChief executive must review safety requirements
Chapter 4Referable dams and flood and drought mitigation
Part 3Declaring temporary full supply levels to mitigate flood or drought
Division 4Reviewing safety requirements for temporary full supply level
396 Chief executive must review safety requirements
(1)
This section applies if a temporary full supply level declared for a dam exceeds the full supply level stated in the resource operations licence under which the dam operates.
(2)
The chief executive must review any requirements about safety (the safety requirements) applying to the dam under the safety conditions or flood mitigation manual for the dam.
(3)
The review must be conducted within—
(a)
1 month after the temporary full supply level is declared; or
(b)
if the Minister requires a shorter period in writing—the shorter period.
This Act’s bill:Explanatory memorandum
Research tools for this sectionSubscription
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.