Chapter 1 — Preliminary
Part 1.1 — Introductory matters
reg 1 Short title reg 2 Commencement reg 3 Section number not used reg 4 Section number not used reg 5 Definitions reg 6 Determination of safety management system reg 7 Meaning of person conducting a business or undertaking—persons excluded reg 8 Meaning of supply reg 9 Provisions linked to health and safety duties in Act Part 1.2 — Application
reg 10 Application of the Act to dangerous goods and high risk plant reg 11 Application of this regulation reg 12 Assessment of risk in relation to a class of hazards, tasks, circumstances or things Part 1.3 — Incorporated documents
reg 13 Documents incorporated as in force when incorporated reg 14 Inconsistencies between provisions reg 15 References to standards Chapter 2 — Representation and participation
Part 2.1 — Representation
Division 1 — Work groups
reg 16 Negotiations for and determination of work groups reg 17 Matters to be taken into account in negotiations Division 2 — Health and safety representatives
reg 18 Procedures for election of health and safety representatives reg 19 Person conducting business or undertaking must not delay election reg 20 Removal of health and safety representatives reg 20A Resources, facilities and assistance—Act, s 70 reg 21 Prescribed health and safety representative training reg 21A Approving courses of training in work health and safety Part 2.2 — Issue resolution
reg 22 Agreed procedure—minimum requirements reg 23 Default procedure Part 2.3 — Cessation of unsafe work
reg 24 Continuity of engagement of worker Part 2.4 — Workplace entry by WHS entry permit holders
reg 25 Training requirements for WHS entry permits reg 26 Form of WHS entry permit reg 27 Notice of entry—general reg 28 Additional requirements—entry under section 117 reg 29 Additional requirements—entry under section 120 reg 30 Additional requirements—entry under section 121 reg 31 Register of WHS entry permit holders Chapter 2A — Work health and safety officers
reg 31A Definitions for chapter reg 31B Application to regulator for certificate of authority reg 31C Deciding application reg 31D Approved registered training organisation may grant certificate of authority reg 31E Approving work health and safety officer courses and registered training organisations reg 31F Expiry of certificate of authority Chapter 3 — General risk and workplace management
Part 3.1 — Managing risks to health and safety
reg 32 Application of pt 3.1 reg 33 Specific requirements must be complied with reg 34 Duty to identify hazards reg 35 Management of risk reg 36 Hierarchy of control measures reg 37 Maintenance of control measures reg 38 Review of control measures Part 3.2 — General workplace management
Division 1 — Information, training and instruction
reg 39 Provision of information, training and instruction Division 2 — General working environment
reg 40 Duty in relation to general workplace facilities reg 41 Duty to provide and maintain adequate and accessible facilities Division 3 — First aid
reg 42 Duty to provide first aid Division 4 — Emergency plans
reg 43 Duty to prepare, maintain and implement emergency plan Division 5 — Personal protective equipment
reg 44 Provision to workers and use of personal protective equipment reg 45 Personal protective equipment used by other persons reg 46 Duties of worker reg 47 Duty of person other than worker Division 6 — Remote or isolated work
reg 48 Remote or isolated work Division 7 — Managing risks from airborne contaminants
reg 49 Ensuring exposure standards for substances etc. not exceeded reg 50 Monitoring airborne contaminant levels Division 8 — Hazardous atmospheres
reg 51 Managing risks to health and safety reg 52 Ignition sources Division 9 — Storage of flammable or combustible substances
reg 53 Flammable and combustible material not to be accumulated Division 10 — Falling objects
reg 54 Management of risk of falling objects reg 55 Minimising risk associated with falling objects Division 11 — Psychosocial risks
Subdivision 1 — Preliminary
reg 55A Meaning of psychosocial hazard reg 55B Meaning of psychosocial risk reg 55BA Meaning of sexual harassment and sex or gender-based harassment Subdivision 2 — General
reg 55C Duty to manage psychosocial risks reg 55D Determining control measures for psychosocial risks Subdivision 3 — Sexual harassment and sex or gender-based harassment
reg 55E Application of subdivision reg 55F Determining control measures reg 55G Review of control measures reg 55H Duty to prepare prevention plan Chapter 4 — Hazardous work
Part 4.1 — Noise
reg 56 Meaning of exposure standard for noise reg 57 Managing risk of hearing loss from noise reg 58 Audiometric testing reg 59 Duties of designers, manufacturers, importers and suppliers of plant Part 4.2 — Hazardous manual tasks
reg 60 Managing risks to health and safety reg 61 Duties of designers, manufacturers, importers and suppliers of plant or structures Part 4.3 — Confined spaces
Division 1 — Preliminary
reg 62 Confined spaces to which this part applies reg 63 Application to emergency service workers Division 2 — Duties of designer, manufacturer, importer, supplier, installer and constructor of plant or structure
reg 64 Duty to eliminate or minimise risk Division 3 — Duties of person conducting business or undertaking
reg 65 Entry into confined space must comply with this division reg 66 Managing risks to health and safety reg 67 Confined space entry permit reg 68 Signage reg 69 Communication and safety monitoring reg 70 Specific control—connected plant and services reg 71 Specific control—atmosphere reg 72 Specific control—flammable gases and vapours reg 73 Specific control—fire and explosion reg 74 Emergency procedures reg 75 Personal protective equipment in emergencies reg 76 Information, training and instruction for workers reg 77 Confined space entry permit and risk assessment must be kept Part 4.4 — Falls
reg 78 Management of risk of fall reg 79 Specific requirements to minimise risk of fall reg 80 Emergency and rescue procedures Part 4.5 — High risk work
Division 1 — Licensing of high risk work
Subdivision 1 — Requirement to be licensed
reg 81 Licence required to carry out high risk work reg 82 Exceptions reg 83 Recognition of high risk work licences in other jurisdictions reg 84 Duty of person conducting business or undertaking to ensure direct supervision reg 85 Evidence of licence—duty of person conducting business or undertaking Subdivision 2 — Licensing process
reg 86 Who may apply for a licence reg 87 Application for high risk work licence reg 88 Additional information reg 89 Decision on application reg 90 Matters to be taken into account reg 91 Refusal to grant high risk work licence—process reg 91A Conditions of licence reg 92 Duration of licence reg 93 Licence document reg 94 Licence document to be available reg 95 Reassessment of competency of licence holder Subdivision 3 — Amendment of licence document
reg 96 Notice of change of address reg 97 Licence holder to return licence reg 98 Replacement licence document reg 99 Voluntary surrender of licence Subdivision 4 — Renewal of high risk work licence
reg 100 Regulator may renew licence reg 101 Application for renewal reg 102 Licence continues in force until application is decided reg 103 Renewal of expired licence reg 104 Provisions relating to renewal of licence reg 105 Status of licence during review Subdivision 5 — Suspension and cancellation of high risk work licence
reg 106 Suspension or cancellation of licence reg 107 Matters taken into account reg 108 Notice to and submissions by licence holder reg 109 Notice of decision reg 110 Immediate suspension reg 111 Licence holder to return licence document reg 112 Regulator to return licence document after suspension Division 2 — Accreditation of assessors
Subdivision 1 — Requirement to be accredited
reg 113 Accreditation required to assess competency for high risk work licence reg 114 Accredited assessor must act in accordance with accreditation Subdivision 2 — Accreditation process
reg 115 Regulator may accredit assessors reg 116 Application for accreditation reg 117 Additional information reg 118 Decision on application reg 119 Matters to be taken into account reg 120 Refusal to grant accreditation—process reg 121 Conditions of accreditation reg 122 Duration of accreditation reg 123 Accreditation document reg 124 Accreditation document to be available Subdivision 3 — Amendment of accreditation document
reg 125 Changes to information reg 126 Accredited assessor to return accreditation document reg 127 Replacement accreditation document reg 128 Voluntary surrender of accreditation Subdivision 4 — Renewal of accreditation
reg 129 Regulator may renew accreditation reg 130 Application for renewal reg 131 Accreditation continues in force until application is decided reg 132 Provisions relating to application Subdivision 5 — Suspension and cancellation
reg 133 Regulator may suspend or cancel accreditation reg 134 Suspension or cancellation of accreditation reg 135 Notice to and submissions by accredited assessor reg 136 Matters to be taken into account reg 137 Notice of decision reg 138 Immediate suspension reg 139 Accredited assessor to return accreditation document reg 140 Regulator to return accreditation document after suspension Subdivision 5
reg 141 Subdivision and section number not used Division 3 — Licence and accreditation register
reg 141A Regulator may keep register Part 4.6 — Demolition work
Division 1 — Notice of demolition work
reg 142 Notice of demolition work Division 2 — Licence to carry out demolition work
reg 143 Requirement to hold a licence to carry out demolition work reg 144 Nominated competent person must be present or readily available reg 144A Recognition of licences to carry out demolition work issued in other jurisdictions Division 3 — Licensing process
reg 144B Who may apply for a licence reg 144C Application for licence to carry out demolition work reg 144D Content of application reg 144E Additional information reg 144F Decision on application reg 144G Regulator to be satisfied about additional matters reg 144H Matters to be taken into account reg 144I Refusal to grant licence—process reg 144J Conditions of licence reg 144K Duration of licence reg 144L Licence document reg 144M Licence document to be available Division 4 — Amendment of licence document
reg 144N Changes to information reg 144O Change to nominated supervisor reg 144P Amendment imposed by regulator reg 144Q Amendment on application by licence holder reg 144R Minor corrections to licence reg 144S Regulator to provide amended licence reg 144T Licence holder to return licence reg 144U Replacement licence document reg 144V Voluntary surrender of licence Division 4A — Renewal of licence
reg 144VA Regulator may renew licence reg 144VB Application for renewal reg 144VC Provisions relating to renewal of licence reg 144VD Renewal of licence—regulator to be satisfied about particular matters reg 144VE Status of licence during review Division 5 — Suspension and cancellation of licence
reg 144W Suspension or cancellation of licence reg 144X Matters taken into account reg 144Y Notice to and submissions by licence holder reg 144Z Notice of decision reg 144ZA Immediate suspension reg 144ZB Licence holder to return licence document reg 144ZC Regulator to return licence document after suspension Part 4.7
reg 145 Part number and section numbers 145–166 not used Part 4.8 — Diving work
Division 1 — Preliminary
reg 167 Purpose of part 4.8 Division 2 — General diving work—fitness and competence of worker
reg 168 Person conducting business or undertaking must ensure fitness of workers reg 169 Certificate of medical fitness reg 170 Duty to keep certificate of medical fitness reg 171 Competence of worker—general diving work reg 172 Competence of worker—incidental diving work reg 173 Competence of worker—limited scientific diving work reg 174 Competence of competent person supervising general diving work reg 175 Evidence of competence—duty of person conducting business or undertaking Division 3 — Managing risks—general diving work
reg 176 Management of risks to health and safety reg 177 Appointment of competent person to supervise diving work reg 178 Additional control—dive plan reg 179 Dive plan must be complied with reg 180 Additional control—dive safety log to be kept reg 181 Use of dive safety log reg 182 Record keeping Division 4 — High risk diving work
reg 183 Duties of person conducting business or undertaking reg 184 Duty of worker—competence Chapter 5 — Plant and structures
Part 5.0 — Preliminary
reg 184A Definition for ch 5 Part 5.1 — General duties for plant and structures
Division 1 — Preliminary
reg 185 Application of part 5.1 to plant reg 186 Application of part 5.1 to structures Division 2 — Duties of persons conducting businesses or undertakings that design plant
reg 187 Provision of information to manufacturer reg 188 Hazard identified in design during manufacture reg 189 Guarding reg 190 Operational controls reg 191 Emergency stop controls reg 192 Warning devices Division 3 — Duties of persons conducting businesses or undertakings that manufacture plant
reg 193 Control of risk reg 194 Guarding reg 195 Information must be obtained and provided Division 4 — Duties of persons conducting businesses or undertakings that import plant
reg 196 Information to be obtained and provided by importer reg 197 Control of risk Division 5 — Duties of persons conducting businesses or undertakings that supply plant
reg 198 Information to be obtained and provided by supplier reg 199 Supply of second-hand plant—duties of supplier reg 200 Second-hand plant to be used for scrap or spare parts Division 6 — Duties of persons conducting businesses or undertakings that install, construct or commission plant or structures
reg 201 Duties of persons conducting businesses or undertakings that install, construct or commission plant reg 202 Duties of persons conducting businesses or undertakings that install, construct or commission structures Division 7 — General duties of a person conducting a business or undertaking involving the management or control of plant
Subdivision 1 — Management of risks
reg 203 Management of risks to health and safety Subdivision 2 — Additional control measures for general plant
reg 204 Control of risks arising from installation or commissioning reg 205 Preventing unauthorised alterations to or interference with plant reg 206 Proper use of plant and controls reg 207 Plant not in use reg 208 Guarding reg 209 Guarding and insulation from heat and cold reg 210 Operational controls reg 211 Emergency stops reg 212 Warning devices reg 213 Maintenance and inspection of plant Subdivision 3 — Additional control measures for particular plant
reg 214 Powered mobile plant—general control of risk reg 215 Powered mobile plant—specific control measures reg 216 Roll-over protection on tractors reg 217 — reg 218 Industrial lift trucks reg 219 Plant that lifts or suspends loads reg 220 Exception—Plant not specifically designed to lift or suspend a person reg 221 Plant used in connection with tree lopping reg 222 Industrial robots reg 223 Lasers reg 224 Pressure equipment reg 225 Scaffolds reg 226 Plant with presence-sensing safeguarding system—records reg 226A Quad bikes—duty of person with management or control of quad bike at workplace reg 226B Quad bikes—duty of worker reg 226C Approved motorbike helmet required if quad bike operated in particular area Part 5.2 — Additional duties relating to registered plant and plant designs
Division 1 — Application of part 5.2
reg 227 Application of pt 5.2 Division 2 — Duty of person conducting a business or undertaking who designs plant to record plant design
reg 228 Records and information reg 229 Record of standards or engineering principles used reg 230 Records to be available for inspection Division 3 — Duties of a person conducting a business or undertaking
reg 231 Duty of persons conducting businesses or undertakings that manufacture plant reg 232 Duty of persons conducting businesses or undertakings that import plant reg 233 Duty of persons conducting businesses or undertakings that supply plant reg 234 Duty of persons conducting businesses or undertakings that commission plant Division 4 — Duties of a person conducting a business or undertaking involving the management or control of plant
Subdivision 1 — Control measures for registered plant
reg 235 Major inspection of registered mobile cranes and tower cranes reg 236 Lifts reg 237 Records of plant Subdivision 2 — Control measures for amusement devices and passenger ropeways
reg 237A Meaning of passenger ropeway reg 238 Operation of amusement devices and passenger ropeways reg 239 Storage of amusement devices and passenger ropeways reg 240 Maintenance, inspection and testing of amusement devices and passenger ropeways reg 241 Annual inspection of amusement devices and passenger ropeways reg 241A Major inspection of amusement device reg 241B Comprehensive inspection of critical components of passenger ropeways reg 242 Log book and manuals for amusement devices reg 242A Requirements of log book Part 5.3 — Registration of plant designs and items of plant
Division 1 — Plant designs to be registered
reg 243 Plant design to be registered reg 244 Altered plant designs to be registered reg 245 Recognition of designs registered by corresponding regulator Division 2 — Items of plant to be registered
reg 246 Requirements for registration of items of plant reg 247 Recognition of plant registered by corresponding regulator Division 3 — Registration process for plant designs
reg 248 Application of division 3 reg 249 Who can apply to register a plant design reg 250 Application for registration reg 251 Design verification statement reg 252 Who can be the design verifier reg 253 Duty of design verifier reg 254 Design verification statements not to be made in particular circumstances reg 255 Additional information reg 256 Decision on application reg 257 Refusal of registration—process reg 258 Conditions of registration reg 259 Registration of plant design granted for unlimited duration reg 260 Plant design registration number reg 261 Registration document reg 262 Registration document to be available reg 263 Disclosure of design information Division 4 — Registration process for an item of plant
reg 264 Application of division 4 reg 265 Who can apply to register an item of plant reg 266 Application for registration reg 267 When is a person competent to inspect plant reg 268 Additional information reg 269 Decision on application reg 270 Refusal of registration—process reg 271 Conditions of registration reg 272 Duration of registration reg 272A — reg 273 Plant registration number reg 274 Registration document reg 275 Registration document to be available reg 276 Regulator may renew registration reg 277 Application for renewal reg 278 Registration continues in force until application is decided reg 279 Decision on application reg 279A Duration of renewal reg 280 Status of registration during review Division 5 — Changes to registration and registration documents
reg 281 Application of division reg 282 Changes to information reg 283 Amendment of registration imposed by regulator reg 284 Amendment on application by registration holder reg 285 Minor corrections to registration reg 286 Regulator to provide amended registration document reg 287 Registration holder to return registration document reg 288 Replacement registration document Division 6 — Cancellation of registration
reg 288A Application of division reg 288B Regulator may cancel registration reg 288C Cancellation process reg 288D Registration holder to return registration document Chapter 6 — Construction work
Part 6.1 — Preliminary
reg 289 Meaning of construction work reg 290 Meaning of structure reg 291 Meaning of high risk construction work reg 292 Meaning of construction project reg 293 Meaning of principal contractor Part 6.2 — Duties of designer of structure and person who commissions construction work
reg 294 Person who commissions work must consult with designer reg 295 Designer must give safety report to person who commissions design reg 296 Person who commissions project must give information to principal contractor Part 6.3 — Duties of person conducting business or undertaking
Division 1 — General
reg 297 Management of risks to health and safety reg 298 Security of workplace Division 2 — High risk construction work—safe work method statements
reg 299 Safe work method statement required for high risk construction work reg 300 Compliance with safe work method statement reg 301 Safe work method statement—copy to be given to principal contractor reg 302 Review of safe work method statement reg 303 Safe work method statement must be kept Division 3 — Excavation work
reg 304 Excavation work—underground essential services information reg 305 Management of risks to health and safety associated with excavation work reg 305A — reg 305B — reg 306 Additional controls—trenches Division 4 — Additional controls—construction work
Subdivision 1 — Definitions
reg 306A Definitions Subdivision 2 — Falls
reg 306B Definition for sdiv 2 reg 306C Risk of fall of less than 3m in housing construction work or less than 2m in other construction work or construction work on roof with slope not over 26° reg 306D Risk of fall of at least 3m in housing construction work or at least 2m in other construction work or construction work on roof with a slope over 26° reg 306E Edge protection as control measure reg 306F Fall protection cover as control measure reg 306G Travel restraint system as control measure reg 306H Fall arresting platform as control measure reg 306I Fall arrest harness system as control measure reg 306J Safety net as control measure Subdivision 3 — Ladders and platforms supported by ladders
reg 306K What work may be done from single or extension ladder reg 306L Work on a ladder reg 306M Ladders generally reg 306N Work on platform supported by trestle ladders reg 306O Platform supported by trestle ladders Subdivision 4 — Scaffolding
reg 306P Erecting scaffolding reg 306Q Dismantling scaffolding Part 6.4 — Additional duties of principal contractor
Division 1 — Application
reg 307 Application of pt 6.4 Division 2 — General duties
reg 308 Specific control measure—signage identifying principal contractor reg 309 WHS management plan—preparation reg 310 WHS management plan—duty to inform reg 311 WHS management plan—review reg 312 High risk construction work—safe work method statements reg 313 Copy of WHS management plan must be kept reg 314 Further health and safety duties—specific sections reg 315 Further health and safety duties—specific risks reg 315A Amenities Division 3 — Duties relating to falling objects
reg 315B Application of div 3 reg 315C Definitions for div 3 reg 315D What is mesh for div 3 reg 315E Risk assessment and control measures for civil construction work and housing construction work reg 315F Control measures for construction work that is not civil construction work or housing construction work reg 315G Additional control measures if measured angle is 75° or more, other than for demolition work or work erecting or dismantling formwork reg 315H Control measures for demolition work or work erecting or dismantling formwork reg 315I Perimeter containment screening as control measure reg 315J Catch platform as control measure reg 315K Gantry as control measure reg 315L Load lifted over adjoining area reg 315M Closure of part or all of adjoining area Part 6.5 — General construction induction training
Division 1 — General construction induction training requirements
reg 316 Duty to provide general construction induction training reg 317 Duty to ensure worker has been trained Division 1A — Recognition of general construction induction training cards issued in other jurisdictions
reg 318 References to general construction induction training cards Division 2 — General construction induction training cards
reg 319 Issue of card reg 320 Content of card reg 321 Replacement card reg 322 Refusal to issue or replace card reg 323 Cancellation of card—grounds reg 324 Cancellation of card—process reg 325 RTO may enter agreement to issue cards Division 3 — Duties of workers
reg 326 Duties of workers reg 327 Alteration of general construction induction training card Chapter 7 — Hazardous chemicals
Part 7.1 — Hazardous chemicals
Division 1 — Application of part 7.1
reg 328 Application of pt 7.1 Division 2 — Obligations relating to safety data sheets and other matters
Subdivision 1 — Obligations of manufacturers and importers
reg 329 Classification of hazardous chemicals reg 330 Manufacturer or importer to prepare and provide safety data sheets reg 331 Safety data sheets—research chemical, waste product or sample for analysis reg 332 Emergency disclosure of chemical identities to registered medical practitioner reg 333 Emergency disclosure of chemical identities to emergency service worker reg 334 Packing hazardous chemicals reg 335 Labelling hazardous chemicals Subdivision 2 — Obligations of suppliers
reg 336 Restriction on age of person who can supply hazardous chemicals reg 337 Retailer or supplier packing hazardous chemicals reg 338 Supplier labelling hazardous chemicals reg 339 Supplier to provide safety data sheets reg 340 Supply of prohibited and restricted carcinogens Subdivision 3 — Obligations of persons conducting businesses or undertakings
reg 341 Labelling hazardous chemicals—general requirement reg 342 Labelling hazardous chemicals—containers reg 343 Labelling hazardous chemicals—pipe work reg 344 Person conducting business or undertaking to obtain and give access to safety data sheets reg 345 Changes to safety data sheets Division 3 — Register and manifest of hazardous chemicals
Subdivision 1 — Hazardous chemicals register
reg 346 Hazardous chemicals register Subdivision 2 — Manifest of schedule 11 hazardous chemicals
reg 347 Manifest of hazardous chemicals reg 348 Regulator must be notified if manifest quantities to be exceeded Division 4 — Placards
reg 349 Outer warning placards—requirement to display reg 350 Placard—requirement to display Division 5 — Control of risk—obligations of persons conducting businesses or undertakings
Subdivision 1 — General obligations relating to management of risk
reg 351 Management of risks to health or safety reg 352 Review of control measures reg 353 Safety signs reg 354 Identification of risk of physical or chemical reaction reg 355 Specific control—fire and explosion reg 356 Keeping hazardous chemicals stable Subdivision 2 — Spills and damage
reg 357 Containing and managing spills reg 358 Protecting hazardous chemicals from damage Subdivision 3 — Emergency plans and safety equipment
reg 359 Fire protection and firefighting equipment reg 360 Emergency equipment reg 361 Emergency plans reg 362 Safety equipment Subdivision 4 — Storage and handling systems
reg 363 Control of risks from storage or handling systems reg 364 Containers for hazardous chemicals used, handled or stored in bulk reg 365 Stopping use and disposing of handling systems reg 366 Stopping use of underground storage and handling systems reg 367 Notification of abandoned tank Subdivision 5
reg 367A — reg 367B — reg 367C — reg 367D — reg 367E — reg 367F — reg 367G — reg 367H — Division 6 — Health monitoring
reg 368 Duty to provide health monitoring reg 369 Duty to inform of health monitoring reg 370 Duty to ensure that appropriate health monitoring is provided reg 371 Duty to ensure health monitoring is supervised by registered medical practitioner with experience reg 372 Duty to pay costs of health monitoring reg 373 Information that must be provided to registered medical practitioner reg 374 Duty to obtain health monitoring report reg 375 Duty to provide health monitoring report to worker reg 376 Duty to provide health monitoring report to regulator reg 377 Duty to provide health monitoring report to relevant persons conducting business or undertakings reg 378 Health monitoring records Division 7 — Induction, information, training and supervision
reg 379 Duty to provide supervision Division 8 — Prohibition, authorisation and restricted use
reg 380 Using, handling and storing prohibited carcinogens reg 381 Using, handling and storing restricted carcinogens reg 382 Using, handling and storing restricted hazardous chemicals reg 383 Application for authorisation to use, handle or store prohibited and restricted carcinogens reg 384 Authorisation to use, handle or store prohibited carcinogens and restricted carcinogens reg 385 Changes to information in application to be reported reg 386 Regulator may cancel authorisation reg 387 Statement of exposure to be provided to workers reg 388 Records to be kept Division 9 — Pipelines
reg 389 Management of risk by pipeline owner reg 390 Pipeline builder's duties reg 391 Management of risks to health and safety by pipeline operator Part 7.2 — Lead
Division 1 — Lead process
reg 392 Meaning of lead process reg 393 Regulator may decide lead process reg 394 Meaning of lead risk work reg 395 Duty to give information about health risks of lead process Division 2 — Control of risk
reg 396 Containment of lead contamination reg 397 Cleaning methods reg 398 Prohibition on eating, drinking and smoking reg 399 Provision of changing and washing facilities reg 400 Laundering, disposal and removal of personal protective equipment reg 401 Review of control measures Division 3 — Lead risk work
reg 402 Identifying lead risk work reg 403 Notification of lead risk work reg 404 Changes to information in notification of lead risk work Division 4 — Health monitoring
reg 405 Duty to provide health monitoring before first commencing lead risk work reg 406 Duty to ensure that appropriate health monitoring is provided reg 407 Frequency of biological monitoring reg 408 Duty to ensure health monitoring is supervised by registered medical practitioner with relevant experience reg 409 Duty to pay costs of health monitoring reg 410 Information that must be provided to registered medical practitioner reg 411 Duty to obtain health monitoring report reg 412 Duty to provide health monitoring report to worker reg 413 Duty to provide health monitoring report to regulator reg 414 Duty to provide health monitoring report to relevant persons conducting business or undertakings reg 415 Removal of worker from lead risk work reg 416 Duty to ensure medical examination if worker removed from lead risk work reg 417 Return to lead risk work after removal reg 418 Health monitoring records Chapter 8 — Asbestos
Part 8.1 — Prohibitions and authorised conduct
reg 419 Work involving asbestos or ACM—prohibitions and exceptions Part 8.2 — General duty
reg 420 Exposure to airborne asbestos at workplace Part 8.3 — Management of asbestos and associated risks
reg 421 Application of pt 8.3 reg 422 Asbestos to be identified or assumed at workplace reg 423 Analysis of sample reg 424 Presence and location of asbestos to be indicated reg 425 Asbestos register reg 426 Review of asbestos register reg 427 Access to asbestos register reg 428 Transfer of asbestos register by person relinquishing management or control reg 429 Asbestos management plan reg 430 Review of asbestos management plan Part 8.4 — Management of naturally occurring asbestos
reg 431 Naturally occurring asbestos reg 432 Asbestos management plan reg 433 Review of asbestos management plan reg 434 Training in relation to naturally occurring asbestos Part 8.5 — Asbestos at the workplace
Division 1 — Health monitoring
reg 435 Duty to provide health monitoring reg 436 Duty to ensure that appropriate health monitoring is provided reg 437 Duty to ensure health monitoring is supervised by registered medical practitioner with relevant experience reg 438 Duty to pay costs of health monitoring reg 439 Information that must be provided to registered medical practitioner reg 440 Duty to obtain health monitoring report reg 441 Duty to provide health monitoring report to worker reg 442 Duty to provide health monitoring report to regulator reg 443 Duty to provide health monitoring report to relevant persons conducting business or undertakings reg 444 Health monitoring records Division 2 — Training
reg 445 Duty to train workers about asbestos Division 3 — Control on use of particular equipment
reg 446 Duty to limit use of equipment Part 8.6 — Demolition and refurbishment
reg 447 Application of pt 8.6 reg 448 Review of asbestos register reg 449 Duty to provide asbestos register reg 450 Duty to obtain asbestos register reg 451 Determining presence of asbestos or ACM reg 452 Identification and removal of asbestos before demolition reg 453 Identification and removal of asbestos before demolition of domestic premises reg 454 Emergency procedure reg 455 Emergency procedure—domestic premises reg 456 Identification and removal of asbestos before refurbishment reg 457 Refurbishment of domestic premises Part 8.7 — Asbestos removal work
reg 458 Duty to ensure asbestos removalist is licensed reg 459 Asbestos removal supervisor must be present or readily available reg 460 Asbestos removal worker must be trained reg 461 Licensed asbestos removalist must keep training records reg 462 Duty to give information about health risks of licensed asbestos removal work reg 463 Asbestos removalist must obtain register reg 464 Asbestos removal control plan reg 465 Asbestos removal control plan to be kept and available reg 466 Regulator must be notified of asbestos removal reg 467 Licensed asbestos removalist must tell particular persons about intended asbestos removal work reg 468 Person with management or control of workplace must tell persons about asbestos removal work reg 469 Signage and barricades for asbestos removal work reg 470 Limiting access to asbestos removal area reg 471 Decontamination facilities reg 472 Disposing of asbestos waste and contaminated personal protective equipment reg 473 Clearance inspection reg 474 Clearance certificates reg 474A Obligations of licensed asbestos removalist in particular circumstances Part 8.8 — Asbestos removal requiring class A asbestos removal licence
reg 475 Air monitoring—asbestos removal requiring class A asbestos removal licence reg 476 Action if respirable asbestos fibre level too high reg 477 Removing friable asbestos Part 8.9 — Asbestos-related work
reg 478 Application of pt 8.9 reg 479 Uncertainty as to presence of asbestos reg 480 Duty to give information about health risks of asbestos-related work reg 481 Asbestos-related work to be in separate area reg 482 Air monitoring reg 483 Decontamination facilities reg 484 Disposing of asbestos waste and contaminated personal protective equipment Part 8.10 — Licensing of asbestos removalists and asbestos assessors
Division 1 — Asbestos removalists—requirement to be licensed
reg 485 Requirement to hold class A asbestos removal licence reg 486 Exception to requirement to hold class A asbestos removal licence reg 487 Requirement to hold class B asbestos removal licence reg 488 Recognition of asbestos removal licences in other jurisdictions Division 2 — Asbestos assessors—requirement to be licensed
reg 489 Requirement to hold asbestos assessor licence reg 490 Recognition of asbestos assessor licences in other jurisdictions Division 3 — Licensing process
reg 491 Who may apply for a licence reg 492 Application for asbestos removal licence or asbestos assessor licence reg 493 Content of application—class A asbestos removal licence reg 494 Content of application—class B asbestos removal licence reg 495 Content of application—asbestos assessor licence reg 496 Additional information reg 497 Decision on application reg 498 Class A asbestos removal licence—regulator to be satisfied about additional matters reg 499 Class B asbestos removal licence—regulator to be satisfied about additional matters reg 500 Matters to be taken into account reg 501 Refusal to grant licence—process reg 502 Conditions of licence reg 503 Duration of licence reg 504 Licence document reg 505 Licence document to be available Division 4 — Amendment of licence document
reg 506 Changes to information reg 507 Change to nominated supervisor reg 508 Amendment imposed by regulator reg 509 Amendment on application by licence holder reg 510 Minor corrections to licence reg 511 Regulator to provide amended licence reg 512 Licence holder to return licence reg 513 Replacement licence document reg 514 Voluntary surrender of licence Division 5 — Renewal of licence
reg 515 Regulator may renew licence reg 516 Application for renewal reg 517 Provisions relating to renewal of licence reg 518 Renewal of asbestos removal licence—regulator to be satisfied about particular matters reg 519 Status of licence during review Division 6 — Suspension and cancellation of licence
reg 520 Suspension or cancellation of licence reg 521 Matters taken into account reg 522 Notice to and submissions by licence holder reg 523 Notice of decision reg 524 Immediate suspension reg 525 Licence holder to return licence document reg 526 Regulator to return licence document after suspension Division 7 — General
reg 527 Asbestos removal licence register reg 528 Asbestos assessors register reg 529 Asbestos removal work must be supervised Chapter 8A — Crystalline silica
Part 8A.1 — Preliminary
reg 529A Definitions for chapter reg 529B When processing of crystalline silica substance is controlled reg 529BA When processing of crystalline silica substance is high risk Part 8A.2 — Requirements for processing crystalline silica substances
reg 529C Processing of crystalline silica substance must be controlled reg 529CA Identifying processing of crystalline silica substance that is high risk reg 529CB Silica risk control plan must be prepared for processing that is high risk reg 529CC Compliance with, and review of, silica risk control plan reg 529CD Duty to train workers about risks of crystalline silica reg 529CE Duty to give results of particular air monitoring to regulator Part 8A.3 — Work involving engineered stone benchtops, panels or slabs
reg 529D Work involving engineered stone benchtops, panels or slabs—prohibition reg 529E Work involving engineered stone benchtops, panels or slabs—exception for particular supply and installation reg 529F Work involving engineered stone benchtops, panels or slabs—exception for particular processing Part 8A.4 — Regulator to be notified of particular processing of engineered stone
reg 529G Notification of particular processing of engineered stone reg 529H Notification of change in information reg 529I Notification that work continues 12 months after last notice given reg 529J Duty to keep notice reg 529K — Part 8A.5
reg 529L — Chapter 9 — Major hazard facilities
Part 9.1 — Preliminary
Division 1 — Application and interpretation
reg 530 This chapter does not apply to particular facilities reg 531 Meaning of major incident reg 532 Meaning of hazardous chemicals that are present or likely to be present reg 533 Meaning of operator of a facility or proposed facility reg 534 Meaning of modification of a facility Division 2 — Requirement to be licensed
reg 535 A major hazard facility must be licensed Part 9.2 — Determinations about major hazard facilities
reg 536 Operators of particular facilities must notify regulator reg 537 Notification—proposed facilities reg 538 Content of notification reg 539 When regulator may conduct inquiry reg 540 Inquiry procedure reg 541 Determination in relation to facility, on inquiry reg 542 Determination in relation to over-threshold facility reg 543 Suitability of facility operator reg 544 Conditions on determination of major hazard facility reg 545 Notice and effect of determinations reg 546 When regulator may revoke a determination reg 547 Re-notification if quantity of schedule 15 chemicals increases reg 548 Notification by new operator reg 549 Time in which major hazard facility licence must be applied for Part 9.3 — Duties of operators of determined major hazard facilities
Division 1 — Application of part 9.3
reg 550 Application of pt 9.3 Division 2 — Safety case outline
reg 551 Safety case outline must be provided reg 552 Content reg 553 Alteration Division 3 — Management of risk
reg 554 Identification of major incidents and major incident hazards reg 555 Safety assessment reg 556 Control of risk reg 557 Emergency plan reg 558 Safety management system reg 559 Review of risk management Division 4 — Safety case
reg 560 Safety case must be provided reg 561 Content reg 562 Coordination for multiple facilities reg 563 Review Part 9.4 — Licensed major hazard facilities—risk management
reg 564 Identification of major incidents and major incident hazards reg 565 Safety assessment reg 566 Control of risk reg 567 Emergency plan reg 568 Safety management system reg 569 Review of risk management reg 570 Safety case—review reg 571 Information for visitors reg 572 Information for local community—general reg 573 Information for local community—major incident Part 9.5 — Consultation and workers’ safety role
reg 574 Safety role for workers reg 575 Operator of major hazard facility must consult with workers Part 9.6 — Duties of workers at licensed major hazard facilities
reg 576 Duties Part 9.7 — Licensing of major hazard facilities
Division 1 — Licensing process
reg 577 Who may apply for a licence reg 578 Application for major hazard facility licence reg 579 Additional information reg 580 Decision on application reg 581 Matters to be taken into account reg 582 When decision is to be made reg 583 Refusal to grant major hazard facility licence—process reg 583A Conditions of licence—payment of relevant fee reg 584 Conditions of licence reg 585 Duration of licence reg 586 Licence document reg 587 Licence document to be available Division 2 — Amendment of licence and licence document
reg 588 Changes to information reg 589 Amendment imposed by regulator reg 590 Amendment on application by operator reg 591 Minor corrections to major hazard facility licence reg 592 Regulator to provide amended licence document reg 593 Operator to return licence reg 594 Replacement licence document Division 3 — Renewal of major hazard facility licence
reg 595 Regulator may renew licence reg 596 Application for renewal reg 597 Licence continues in force until application is decided reg 598 Provisions relating to renewal of licence reg 599 Status of major hazard facility licence during review Division 4 — Transfer of major hazard facility licence
reg 600 Transfer of major hazard facility licence Division 5 — Suspension and cancellation of major hazard facility licence
reg 601 Cancellation of major hazard facility licence—on operator’s application reg 602 Suspension or cancellation of licence—on regulator's initiative reg 603 Matters to be taken into account reg 604 Notice to and submissions by operator reg 605 Notice of decision reg 606 Immediate suspension reg 607 Operator to return licence document reg 608 Regulator to return licence document after suspension Chapter 9A — Major amusement parks
Part 9A.1 — Preliminary
reg 608A Meaning of major amusement park reg 608B Meaning of amusement device incident reg 608C Meaning of operator of a major amusement park Part 9A.2 — Requirement to be licensed
reg 608D Major amusement park must be licensed reg 608E Time in which major amusement park licence must be applied for Part 9A.3 — Duties of operators of major amusement parks
Division 1 — Application of part
reg 608F Application of part Division 2 — Safety case outline
reg 608G Safety case outline must be given reg 608H Content reg 608I Alteration reg 608J Notice of material change Division 3 — Management of risk
reg 608K Identification of amusement device incidents and amusement device hazards reg 608L Safety assessment reg 608M Control of risk reg 608N Amusement device emergency plan reg 608O Safety management system reg 608P Review of risk management Division 4 — Safety case
reg 608Q Amusement device safety case must be given reg 608R Content reg 608S Coordination for multiple major amusement parks reg 608T Review Part 9A.4 — Licensed major amusement parks—risk management
Division 1 — Continued risk management
reg 608U Identification of amusement device incidents and amusement device hazards reg 608V Safety assessment reg 608W Control of risk reg 608X Amusement device emergency plan reg 608Y Safety management system Division 2 — Review of risk management
reg 608Z Obligations to review Part 9A.5 — Consultation and workers’ safety role
reg 608ZA Safety role for workers reg 608ZB Operator of major amusement park must consult with workers—Act, s 49 Part 9A.6 — Duties of workers at licensed major amusement parks
reg 608ZC Duties Part 9A.7 — Licensing of major amusement parks
Division 1 — Licensing process
reg 608ZD Who may apply for a licence reg 608ZE Application for major amusement park licence reg 608ZF Additional information reg 608ZG Decision on application reg 608ZH Matters to be taken into account reg 608ZI When decision is to be made reg 608ZJ Refusal to grant major amusement park licence—process reg 608ZK Conditions of licence—payment of relevant fee reg 608ZL Conditions of licence reg 608ZM Effect and duration of licence reg 608ZN Licence document reg 608ZO Licence document to be available Division 2 — Amendment of licence and licence document
reg 608ZP Changes to information reg 608ZQ Amendment imposed by regulator reg 608ZR Amendment on application by operator reg 608ZS Minor corrections to major amusement park licence reg 608ZT Regulator to give amended licence document reg 608ZU Operator to return licence reg 608ZV Replacement licence document Division 3 — Renewal of major amusement park licence
reg 608ZW Regulator may renew licence reg 608ZX Application for renewal reg 608ZY Licence continues in force until application is decided reg 608ZZ Provisions relating to renewal of licence reg 608ZZA Status of major amusement park licence during review Division 4 — Transfer of major amusement park licence
reg 608ZZB Transfer of major amusement park licence Division 5 — Cancellation and suspension of major amusement park licence
reg 608ZZC Cancellation of major amusement park licence—on operator’s application reg 608ZZD Suspension or cancellation of licence—on regulator’s initiative reg 608ZZE Matters to be taken into account reg 608ZZF Notice to and submissions by operator reg 608ZZG Notice of decision reg 608ZZH Operator to return licence document reg 608ZZI Regulator to return licence document after suspension Chapter 10
reg 609 Chapter number and section numbers 609–675 not used Chapter 11 — General
Part 11.1 — Review of decisions
Division 1 — Reviewable decisions
reg 676 Which decisions are reviewable Division 2 — Internal review
reg 677 Application reg 678 Application for internal review reg 679 Internal reviewer reg 680 Decision of internal reviewer reg 681 Decision on internal review reg 682 Internal review—reviewable decision continues Division 3 — External review
reg 683 Application for external review Part 11.2 — Exemptions
Division 1 — General
reg 684 General power to grant exemptions reg 685 Matters to be considered in granting exemptions Division 2 — High risk work licences
reg 686 High risk work licence—exemption reg 687 High risk work licence—regulator to be satisfied about particular matters Division 3 — Major hazard facilities
reg 688 Major hazard facility—exemption reg 689 Major hazard facility—regulator to be satisfied about particular matters Division 3A — Engineered stone
reg 689AA Definition for division reg 689A Engineered stone—exemption reg 689B Engineered stone—application for exemption reg 689C Engineered stone—notifying persons of application for exemption reg 689D Engineered stone—regulator to be satisfied about particular matters reg 689E Safe Work Australia may issue and publish document in relation to exemptions Division 4 — Exemption process
reg 690 Application for exemption reg 691 Conditions of exemption reg 692 Form of exemption documents reg 693 Compliance with conditions of exemption reg 694 Notice of decision in relation to exemption reg 695 Publication of exemption reg 696 Notice of refusal of exemption reg 697 Amendment or cancellation of exemption reg 698 Notice of amendment or cancellation Part 11.3 — Miscellaneous
reg 699 Incident notification—prescribed serious illnesses reg 700 Inspectors’ identity cards reg 701 Review of decisions under the Act—stay of decision reg 701AA Fee for application for report relating to workers’ compensation self-insurance reg 701A Prescribed Act—Act, s 271A reg 701B Fee waiver for registration of particular items of plant Chapter 12 — Public health and safety—schedule 1, part 1 of Act
Part 12.1 — Preliminary
reg 702 Definitions for chapter reg 702A High risk plant—Act, sch 1, s 1 Part 12.2 — Primary duty
reg 703 Primary duty of care reg 704 Duty of officers reg 705 Duties of other persons at relevant premises reg 706 Reckless conduct reg 707 Failure to comply with health and safety duty reg 708 Failure to comply with health and safety duty Part 12.3 — Applied provisions
reg 709 Application of provisions reg 710 Modification of applied provisions Part 12.4 — Incident notification
reg 711 Duty to notify of notifiable incidents reg 712 Duty to preserve incident sites Part 12.5 — Authorisations
reg 713 Meaning of authorised reg 714 Requirements for authorisation of plant or substance reg 715 Requirement to comply with conditions of authorisation Chapter 13 — Transitional provisions
Part 13.1 — Transitional provisions for Work Health and Safety Regulation 2011
Division 1 — Emergency plans
reg 716 Lead in time for s 43 emergency plan Division 2 — Falls
reg 717 Staged introduction of s 80 emergency and rescue procedures Division 3 — Plant and plant design
reg 718 Existing registration—plant and plant design reg 719 Pending applications—plant and plant design reg 720 Provision for plant that on the commencement is not required to be registered under pt 5.3 Division 4 — High risk work
reg 721 Definition for div 4 reg 722 Existing licence—high risk work reg 723 Pending applications—high risk work reg 724 Applications for high risk work licence until 31 December 2014 if no VET course available reg 725 Applications for high risk work licence if statement of attainment and assessment summary held under repealed WHS regulation reg 726 Particular licence classes to include other licence classes reg 727 Existing exemption—high risk work reg 728 Pending exemption applications—high risk work reg 729 Revival of authority—applications under s 43 of the repealed WHS regulation reg 730 Existing licence issued before 1 July 2008—high risk work Division 5 — Earthmoving and particular crane work
reg 731 Cancellation of earthmoving or particular crane work certificate and withdrawal of applications Division 6 — Certificate for prescribed activity that is demolition work
reg 732 Existing certificate to perform demolition work continues as a transitional demolition work licence reg 733 Transitional demolition work licence and requirement for nominated supervisor reg 734 Transitional demolition work licence and requirement to train worker reg 735 Existing provisions about certificate process continue to apply for a transitional demolition work licence reg 736 Conditions for transitional demolition work licence Division 7 — Accredited providers and approvals
reg 737 Cancellation of certificate of appointment as accredited provider and withdrawal of applications reg 738 Training and assessment in high risk work under repealed WHS regulation reg 739 Existing approval—providing training and assessment for high risk work reg 740 Pending applications—providing training and assessment for high risk work reg 741 Cancellation of approval to provide training and assessment for earthmoving and particular crane occupation and withdrawal of applications Division 8 — Certificates and licences
reg 742 Replacement of existing certificates and licences reg 743 Suspension and cancellation of existing certificates and licences Division 9 — Asbestos related provisions
reg 744 Definitions for div 9 reg 745 Existing friable asbestos certificate continues as a transitional class A asbestos removal licence reg 746 Transitional class A asbestos removal licence and requirement for nominated asbestos removal supervisor reg 747 Transitional class A asbestos removal licence and requirement to train worker reg 748 Existing provisions about certificate process continue to apply for a transitional class A asbestos removal licence reg 749 Conditions for transitional class A asbestos removal licence reg 750 Existing bonded asbestos removal certificate continues as transitional class B asbestos removal licence reg 751 Holder of transitional class B asbestos removal licence to notify change of address reg 752 Existing provisions about certificate process continue to apply for a transitional class B asbestos removal licence reg 753 Conditions for transitional class B asbestos removal licence reg 754 — reg 755 Training requirement for worker under section 460(1) satisfied by alternative to certification reg 756 Application for class A asbestos removal licence when specified VET course unavailable for named supervisors reg 757 Application for class B asbestos removal licence when specified VET course unavailable for named supervisors reg 758 No need for asbestos register in particular transitional circumstances reg 759 No need for asbestos management plan in particular transitional circumstances reg 760 Transitional licensed asbestos assessor reg 761 Transitional competent person for ss 473 and 474 clearance inspection and certificates Division 10 — Lead
reg 762 Results of health surveillance Division 11 — Construction work
reg 763 General induction card reg 764 Work method statement taken to be safe work method statement reg 765 Construction safety plan taken to be WHS management plan Division 12 — Miscellaneous
reg 766 Keeping of documents reg 767 References to repealed WHS regulation Part 13.2 — Transitional provisions for Dangerous Goods Safety Management Regulation 2001
Division 1 — Preliminary
reg 768 Definitions for pt 13.2 Division 2 — Major hazard facilities
reg 769 Existing major hazard facility reg 770 Existing notification of facility awaiting chief executive decision reg 771 Existing major hazard facility with validated safety report reg 772 Existing major hazard facility with safety report not yet validated reg 773 Operator must provide information within 3 months reg 774 Existing major hazard facility with directive not yet satisfied reg 775 Operator given 12 months to be fully compliant Division 3 — Large dangerous goods location
reg 776 Existing notification of large dangerous goods location Part 13.3 — Other transitional provisions
reg 777 Particular provision for audiometric testing reg 778 Requirements for dive supervisors of high risk diving work until 31 December 2012 reg 779 Registration of design of particular item of plant not needed until end of 31 December 2014 reg 780 — reg 781 Introductory period for GHS reg 782 Existing abandoned tank used to store flammable gases and flammable liquids reg 783 Existing use, handling or storing of prohibited or restricted carcinogens reg 784 Existing pipeline builder’s duties reg 785 Existing facility with schedule 15 chemicals exceeding 10% of threshold quantity—additional 3 months to give notice (section 536) reg 786 Transitional provision for particular high risk work licences reg 786A Applications for class B asbestos removal licence reg 786B Transitional class B asbestos removal licence holders—supervision of asbestos removal work Part 13.4 — Transitional provision for Work Health and Safety and Other Legislation Amendment Act 2017
reg 787 Training requirements for health and safety representatives Part 13.6 — Transitional provision for Work Health and Safety and Other Legislation Amendment Regulation 2018
reg 791 Training requirements for health and safety representatives Part 13.7 — Transitional provisions for Work Health and Safety (Amusement Devices—Public Safety) Amendment Regulation 2019
reg 792 Definitions for part reg 793 First major inspection of previously inspected amusement devices reg 794 First major inspection of other amusement devices Part 13.8 — Transitional provision for Work Health and Safety (Plant Registration) Amendment Regulation 2020
reg 795 Application of s 701B Part 13.9 — Transitional provisions for Work Health and Safety and Other Legislation Amendment Regulation 2024
reg 796 Initial training for health and safety representatives reg 797 Delayed application of s 58 Part 13.10 — Transitional provision for Work Health and Safety Amendment Regulation 2024
reg 798 Application of new pts 5.2 and 5.3 to existing passenger ropeways Schedule 3 — High risk work licences and classes of high risk work
reg 1 Boom-type elevating work platform Schedule 5 — Registration of plant and plant designs
Part 1 — Plant requiring registration of design
reg 1 Items of plant requiring registration of design reg 2 Exceptions Part 2 — Items of plant requiring registration
reg 3 Items of plant requiring registration reg 4 Exceptions Schedule 5A — Principal contractors—particular amenities for construction work
Part 1 — Definitions for schedule 5A
reg 1 Definitions Part 2 — Toilets
Division 1 — Toilets to be reasonably available
reg 2 Deciding whether toilets are reasonably available reg 2A Duty to ensure toilets are reasonably available reg 2B Required minimum number of toilets reg 2C Additional requirement about number and location of toilets for multilevel buildings reg 2D Additional requirement about location of designated female toilets reg 2E Requirements about accessibility of designated female toilets Division 2 — Requirements about toilets
reg 3 When toilet must be connected toilet or portable toilet reg 4 Privacy, ventilation and toilet paper reg 4A Other requirements Part 3 — Other amenities
reg 5 Room, or sheltered area, to eat meals in reg 6 Hands and face washing facilities reg 7 Drinking water Schedule 6 — Classification of mixtures
reg 1 Purpose of this schedule Schedule 7 — Safety data sheets
reg 1 Safety data sheets—content reg 2 Safety data sheets—research chemical, waste product or sample for analysis Schedule 8 — Disclosure of ingredients in safety data sheet
reg 1 Purpose of this schedule reg 2 Identity of ingredients to be disclosed reg 3 Generic names used to disclose identity of ingredients reg 4 Disclosing proportions of ingredients Schedule 9 — Classification, packaging and labelling requirements
Part 1 — Correct classification
reg 1 Correct classification of a substance, mixture or article Part 2 — Correct packing
reg 2 Correctly packing hazardous chemicals Part 3 — Correct labelling
reg 3 Labelling hazardous chemicals—general reg 4 Labelling hazardous chemicals—small container reg 5 Labelling hazardous chemicals—research chemicals or samples for analysis reg 6 Labelling hazardous chemicals—decanted or transferred chemicals reg 7 Labelling hazardous chemicals—known hazards reg 8 Labelling hazardous chemicals—waste products reg 9 Labelling hazardous chemicals—explosives reg 10 Labelling hazardous chemicals—agricultural and veterinary chemicals Schedule 11 — Placard and manifest quantities
reg 1 Determination of classification of flammable liquids Schedule 12 — Manifest requirements
reg 1 Manifest—general information reg 2 Manifest—bulk storage and containers reg 3 Manifest—identification of hazardous chemical reg 4 Manifest—storage area for packaged hazardous chemicals reg 5 Manifest—hazardous chemicals being manufactured reg 6 Manifest—hazardous chemicals in transit reg 7 Manifest—plan of workplace Schedule 13 — Placard requirements
reg 1 Displaying placards reg 2 Maintaining placards reg 3 Outer warning placards—requirements reg 4 Placards for particular hazardous chemicals stored in bulk reg 5 Placards for unstable explosives, organic peroxides type A or self-reactive substances type A stored in bulk reg 6 Placards for packaged schedule 11 hazardous chemicals (other than flammable liquids category 4) and IBCs reg 7 Placards for flammable liquids category 4 packaged or in bulk Schedule 15 — Hazardous chemicals at major hazard facilities (and their threshold quantity)
reg 1 Definitions reg 2 Relevant hazardous chemicals reg 3 Threshold quantity of one hazardous chemical reg 4 Threshold quantity of more than one hazardous chemical reg 5 How table 15.1 must be used reg 6 How table 15.2 must be used Schedule 16 — Matters to be included in emergency plan for major hazard facility
reg 1 Site and hazard detail reg 2 Command structure and site personnel reg 3 Notifications reg 4 Resources and equipment reg 5 Procedures Schedule 17 — Additional matters to be included in safety management system of major hazard facility
reg 1 Safety policy and safety objectives reg 2 Organisation and personnel reg 3 Operational controls reg 4 Duties of operators reg 5 Management of change reg 6 Principles and standards reg 7 Performance monitoring reg 8 Audit Schedule 18 — Additional matters to be included in safety case for a major hazard facility
Part 1 — Facility description
reg 1 The facility reg 2 The surrounding area Part 2 — Safety information
reg 3 Control measures to limit the consequences of major incidents reg 4 Performance monitoring reg 5 Safety management system reg 6 Safety and reliability of facility structures and plant reg 7 Major incident history Schedule 18B — Matters to be included in amusement device emergency plan for major amusement park
reg 1 Workplace hazard and detail reg 2 Command structure and workplace personnel reg 3 Notifications reg 4 Resources and equipment reg 5 Procedures Schedule 18C — Matters to be included in amusement device safety management system of major amusement park
reg 1 Safety policy and safety objectives reg 2 Organisation and personnel reg 3 Operational controls reg 4 Duties of operators reg 5 Management of change reg 6 Principles and standards reg 7 Performance monitoring reg 8 Audit Schedule 1 — Schedule number not used Schedule 3 — High risk work licences and classes of high risk work Schedule 4 — High risk work licences—competency requirements Schedule 10 — Prohibited carcinogens, restricted carcinogens and restricted hazardous chemicals Schedule 11 — Placard and manifest quantities Schedule 14 — Requirements for health monitoring Schedule 18A — Prescribed Acts—Act, section 271A Schedule 19 — Dictionary