17
CurrentTransmission of gas for sale
Part 3Design and Construction of Gas Infrastructure
17 Transmission of gas for sale
Before the transmission of gas in a transmission pipeline for the purposes of sale may be undertaken, a licensee and the Director must both comply with the requirements specified in Schedule 4 relevant to the construction, commissioning and operation of the transmission pipeline.
Research tools for this sectionSubscription
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.