reg 121
In forceRail operators
Part 10Bulk transfer of dangerous goods
Division 2Equipment and transfer
121 Rail operators
A rail operator engaged in the bulk transfer of dangerous goods must ensure that any hose assembly that is used, or that is intended to be used, for the transfer of the dangerous goods (other than a hose assembly for which the rail operator is not responsible)—
(a)
has been constructed, assembled and maintained in accordance with Chapter 10.1 of the ADG Code; and
(b)
has been inspected and tested at the intervals, and in the way, required under that Chapter; and
(c)
satisfies each test under that Chapter.
- In the case of a natural person, 18 penalty units;
In the case of a body corporate, 90 penalty units.