219 Route of underground lines
A person who carries out electrical installation work on an underground electric line must ensure that a record of the route of the underground electric line is recorded in a legible and permanent form on a durable material that is fixed—
at the main switchboard; or
in a position approved by Energy Safe Victoria.
A person who carries out electrical installation work must ensure the record is fixed in accordance with subregulation (1) before the certificate of compliance for the installation work is signed and—
before the electric line is connected to the electricity supply; or
if the electrical circuits or electrical equipment handled in the course of the electrical installation work were not disconnected from the electricity supply, before the electrical installation is first used after it is completed; or
if the person has not completed all the electrical installation work they have been engaged to complete at the premises where the underground electric line is located, within 5 business days after carrying out the installation work.
The route of the electric line must be recorded as accurately as practicable with a margin of error not exceeding 200 millimetres.
A person who carries out electrical installation work on an underground electric line on public land (other than an electric line forming part of a railway) must, before the line is connected to an electricity supply or within 2 business days after relocating the line, give sufficient information to enable every cable of the line to be located and identified to the person who controls the underground electric line.