Revision of safety case—change
45 Revision of safety case—change
A gas company must submit a revised safety case to Energy Safe Victoria if—
developments in technical knowledge or the assessment of hazards relevant to the facility make it appropriate to revise the safety case; or
S. 45(b) amended by No. 22/2023 s. 47(a).
proposed modifications of the facility will result in an increase in the overall levels of risk in relation to the facility; or
S. 45(c) amended by No. 22/2023 s. 47(b).
a proposed modification of the facility may influence the level of a specific risk or the ranking of risk contributing factors; or
S. 45(d) amended by No. 22/2023 s. 47(c).
the gas company proposes to make a change to the safety management system in relation to the facility; or
the gas company proposes to dismantle, decommission or remove the facility or part of the facility in a different manner from the procedures set out in the safety case for the facility.
S. 46 amended by No. 39/2005 s. 52(Sch. 2 item 2), substituted by No. 22/2023 s. 48.
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.