Specific proceedings—former AEMO property
144 Specific proceedings—former AEMO property
Without limiting section 143, if, immediately before the relevant date for an allocation statement, proceedings relating to former AEMO property (including arbitration proceedings) allocated to VicGrid under the allocation statement, to which AEMO was a party were pending or existing in any court or tribunal, or being conducted by an arbitrator, arbitration panel or dispute resolution panel, then, on and after that relevant date, VicGrid is substituted for AEMO as a party to the proceedings and has the same rights in the proceedings as AEMO had.
S. 145 inserted by No. 38/2025 s. 57.
Sign in to see bill, explanatory material, and regulations and instruments
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.