Regulatory control period includes determination extension period
16VC Regulatory control period includes determination extension period
This section applies despite anything to the contrary in—
the National Electricity (Victoria) Law; or
the Rules; or
an applicable 2016–2020 distribution determination.
For the purposes of the National Electricity (Victoria) Law, the Rules, an applicable 2016–2020 distribution determination and this Division—
the regulatory control period for which a Victorian DNSP is subject to a control mechanism imposed by the applicable 2016–2020 distribution determination is—
the 5 regulatory years which apply since the commencement of the determination; and
the determination extension period; and
the determination extension period is taken to be a regulatory year.
S. 16VD inserted by No. 28/2020 s. 3.
Sign in to see bill, explanatory material, and regulations and instruments
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.