Content of REZ scheme authority
33M Content of REZ scheme authority
A REZ scheme authority must—
specify—
the renewable energy zone within which the REZ scheme authority holder wishes to establish a connection to the declared transmission system for an eligible generating system or eligible integrated resource system; or
the renewable energy zone within which an eligible generating system or eligible integrated resource system, forming part of the applicable eligible facility, is connected to the declared transmission system; and
if the REZ scheme authority holder is wishing to establish a connection to the declared transmission system for an eligible generating system or eligible integrated resource system, specify—
the kind of generating system or integrated resource system for which the connection is to be established; and
the nameplate rating of the generating system or integrated resource system; and
if the REZ scheme authority holder is the owner, operator or controller of a facility connected to the declared transmission system—
specify the kind of facility it is; and
describe the system change the holder wishes to carry out; and
specify the nameplate rating of the facility before and after the carrying out of the system change; and
set out any conditions determined by VicGrid.
In this section—
applicable eligible facility means the eligible facility in respect of which the REZ scheme authority holder is wishing to carry out the system change.
S. 33N inserted by No. 38/2025 s. 33.
Sign in to see bill, explanatory material, and regulations and instruments
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.