Application
33O Application
A REZ scheme authority holder who—
owns, operates or controls a facility in relation to which the REZ scheme authority they hold has been issued; and
wishes to carry out a system change to that facility—
may apply to VicGrid to amend the REZ scheme authority or any conditions determined by VicGrid to which the authority is subject, or both.
An application under subsection (1) must—
be prepared in accordance with the REZ scheme declaration made for or with respect to the renewable energy zone within which an eligible generating system or eligible integrated resource system, forming part of the facility, is connected to the declared transmission system; and
contain any information that is prescribed.
S. 33P inserted by No. 38/2025 s. 33.
Sign in to see bill, explanatory material, and regulations and instruments
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.