279
In forceWaste containment
Chapter 4Hazardous substances and materials
Part 4.4Asbestos
Division 7Removal of asbestos
Subdivision 3Class A and Class B asbestos removal work
279 Waste containment
An asbestos removal licence holder who is performing asbestos removal work must ensure that—
(a)
the asbestos waste is contained so as to eliminate the release of airborne asbestos fibres; and
(b)
the exterior of the container—
(i)
is decontaminated before being removed from the area where the removal work was performed; and
(ii)
indicates the presence of asbestos.
Note
Act compliance—sections 21, 23 and 24 (see regulation 7).
Sign in to see bill, explanatory material, and regulations and instruments
Research tools for this sectionSubscription
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.