Obligation to attach or connect premises
4 Obligation to attach or connect premises
This regulation applies if premises are not attached to a distribution system (including a distribution system that is part of an SPS) and —
a retailer seeks to make arrangements with the distributor for the premises to be attached or connected; or
a customer applies to the distributor for the premises to be attached.
The distributor must, in the circumstances described in regulation 5(1), either —
attach or connect the premises to the system, as the case requires; or
provide an SPS for the supply of electricity to the premises.
Note for this subregulation:
The capacity of the Electricity Networks Corporation and the Regional Power Corporation to provide an SPS may be limited by the Code: see section 105(1)(cb) of the Act.
[Regulation 4 inserted: SL 2021/185 r. 9.]