Barrister AI
All legislation
WARegulation
In force
This is the latest official compilation.Check the official source →
reg 13

Waste water treatment structures

In force
Part 5Waste water treatment

13 Waste water treatment structures

An operator must ensure that —

(a)

except in the case of an existing facility, a containment structure at the abattoir is impermeable;

(b)

a containment structure at the abattoir is operated so that there is a distance of not less than 300 mm between any point on the perimeter of the top of the structure and the surface of the water in the structure;

(c)

a crust or cover is maintained over an anaerobic treatment process used in a waste water treatment system;

(d)

in the case of a waste water treatment system which uses a pond, waste water is retained in the pond for not less than 15 days; and

(e)

the waste water treatment system is managed so as to ensure that an unreasonable odour does not escape from the abattoir.

Research tools for this sectionPro

The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.