Exclusions from definition of pipeline
Schedule 2 Exclusions from definition of pipeline
[r. 5]
Prescribed gas processing plant | Prescribed exit flange or connection point |
|---|---|
New South Wales | |
Rosalind Park (Camden) | In respect of the pipeline mentioned in pipeline licence no. 30 under the Pipelines Act 1967 of New South Wales — (a) the 150NB flange located approximately 2 metres upstream of the pipeline insulating joint and immediately downstream of the Rosalind Park Gas Plant’s sales gas metering facility. |
Northern Territory | |
Palm Valley | In respect of the Palm Valley Gas Pipeline the flange — (a) shown as the insulating flange on the drawing entitled Palm Valley — Alice Springs Gas Pipe Line Well‑Head Assembly — Drawing Number 10‑011 (Revision 6 of 8/84) held by the Northern Territory Department of Mines and Energy at Darwin; and (b) situated at the Palm Valley Gas Plant immediately inside the perimeter fence downstream of the main gas plant and immediately upstream of the launching system. |
Mereenie Gas Plant | In respect of the Mereenie Gas Pipeline — the flange — (a) shown as the insulating flange (I.F.) on the drawing entitled Amadeus Basin to Darwin Pipeline Mereenie Meter Station — P & I Diagram Inlet and Station Limit Valve — Drawing Number AD M000‑7002 (Revision D of 25.2.86) held by the Northern Territory Department of Mines and Energy at Darwin; and (b) situated at the Mereenie Gas Plant immediately inside the perimeter fence and downstream of the main gas plant. |
Queensland References to diagrams in the entries relating to Queensland are references to diagrams held by the Department of Mines and Energy at Brisbane. | |
Wungoona J.V. | In respect of the pipeline mentioned in pipeline licence PPL no. 2 (Wallumbilla to Brisbane) under the Petroleum Act 1923 of Queensland — (a) the flange located immediately upstream of the series of valves before the meter run, as shown on diagram W, Wungoona JV‑RBP ML 1A Metering Station and marked “AA” on the diagram. |
In respect of the pipeline mentioned in pipeline licence PPL no. 30 under the Petroleum Act 1923 of Queensland — (a) the pipe weld on the upstream side of an insulating joint located immediately upstream of the main flow control valve, as shown on diagram X, Wungoona JV — Duke Energy Pipeline and marked “BB” on the diagram. | |
Ballera | In respect of the pipeline mentioned in pipeline licence PPL no. 24 under the Petroleum Act 1923 of Queensland — (a) the 2 flanges on the upstream sides of 2 isolating valves upstream of where the pipeline separates into 2 parallel meter runs, as shown on diagram Y, Ballera Gas Centre — SWQ Unit — Epic Pipeline and marked “CC” and “DD” on the diagram. |
In respect of the pipeline mentioned in pipeline licence PPL no. 41 under the Petroleum Act 1923 of Queensland — (a) the pipe weld on the upstream side of the insulating joint leading to the 2 meter runs operated by the Ballera‑Mount Isa Pipeline, as shown on diagram Z, Ballera Gas Centre — SWQ Unit — Ballera and marked “EE” on the diagram. | |
Gilmore | In respect of the pipeline mentioned in pipeline licence PPL no. 15 under the Petroleum Act 1923 of Queensland — (a) the upstream flange of the actuated slamshut valve XV‑0305 that is located on the metering skid downstream of the gas flow measurement, as shown on Energy Equity’s P & I Drawing No. G101‑40F‑0004. |
Moura Mine | In respect of the pipeline mentioned in mining lease ML no. ML 80032 under the Mineral Resources Act 1923 of Queensland — (a) the downstream face of the flanged ball valve SLV 0202 located between the dehydration unit and the launcher station, as shown on Drawings Nos NP03777‑P11 and NP03777‑P77. |
Kincora | In respect of the pipeline mentioned in pipeline licence PPL no. 3 under the Petroleum Act 1923 of Queensland — (a) the 150NB class 600 flange immediately downstream of the Kincora Gas Plant’s 150NB class 600 actuated isolation valve, as shown on P & ID Drawing No. 600‑1001 Rev 3. |
Central Treatment (Westgrove) | In respect of the pipeline mentioned in pipeline licence PPL no. 11 under the Petroleum Act 1923 of Queensland — (a) the 200NB class 900 flange located approximately 0.7 m away from the Central Treatment Plant’s main 200NB pipeline and pig launching facility immediately downstream of the plant’s 200NB class 900 main isolation valve, as shown on P & ID Drawing No. 3100 10 0020 Rev 6. |
Rolleston | In respect of the pipeline mentioned in pipeline licence PPL no. 10 under the Petroleum Act 1923 of Queensland — (a) the 150NB class 900 flange located immediately downstream of the 150NB class 900 isolation valve that is immediately downstream of the moisture analyser on the Rolleston Gas Plant’s sales gas metering facility, as shown on P & ID Drawing No. 3500‑10‑0020 Rev 5. |
Dawson River Central | In respect of the pipeline mentioned in pipeline licence PPL no. 26 under the Petroleum Act 1923 of Queensland — (a) the 150NB class 600 flange located immediately downstream of the 150NB class 600 isolation valve at the tie‑in station, as shown on P & ID Drawing No. DR — 11014 Rev 1. |
Moura Central | In respect of the pipeline mentioned in pipeline licence PPL no. 26 under the Petroleum Act 1923 of Queensland — (a) the 150NB class 600 flange located immediately downstream of the 150NB class 600 isolation valve at the tie‑in station pit, as shown on P & ID Drawing No. DR — 11014 Rev 1. |
South Australia | |
Moomba Plant | In respect of the pipeline conveying natural gas from the Moomba natural gas processing plant to Adelaide — (a) the insulating joint situated between the meter station for the pipeline and EPIC’s after cooler (as indicated in Diagram 1 below). |
In respect of the pipeline conveying natural gas from the Moomba natural gas processing plant to Sydney — (a) the downstream weld of the 600 mm x 750 mm reducer situated, upstream of the insulation flange, between the meter station and East Australian Pipeline Ltd’s mainline 750 mm valve on the outlet of the meter station (as indicated in Diagram 2 below). | |
Katnook Plant | The insulating flange that is located one metre inside the boundary fence of the plant, upstream of the pipeline branch to Safries and downstream of the emergency shut down skid, as shown on drawing 107.5.1 held by the Office of Energy Policy at Adelaide. |
Victoria | |
Longford gas processing plant, | The exit flanges contained within the Longford Metering Station at Garretts Road, Longford, Victoria which are connected to the two 600 mm pipes from the prescribed gas processing plant to the Longford Metering Station and are — (a) the 600 mm weld on the 750 mm by 600 mm reducer; and (b) the upstream flange face of the 600 mm branch valve; and (c) the 600 mm weld 3000 mm downstream on the side arm of the 600 mm equal tee, all of which are immediately upstream of the metering runs which form a part of the Longford Metering Station. |
North Paaratte gas processing plant, Government Road, Paaratte, Victoria | The exit flange that is the upstream flange face of the first actuated slamshut valve immediately upstream of the metering runs which form a part of the Paaratte Metering Station at Government Road, Paaratte. |
Western Australia | |
North West Shelf Gas Project Domestic Gas | In respect of the pipeline that is the subject of pipeline licence PL40 under the Petroleum Pipelines Act 1969 of Western Australia — (a) the upstream flange of the flange joint immediately upstream of the most upstream of the monolithic insulation joints that are inside the fence of the pipeline’s Dampier facilities compound. |
Tubridgi | In respect of the pipeline that is the subject of pipeline licence PL16 under the Petroleum Pipelines Act 1969 of Western Australia — (a) the downstream flange of the plant exit shut down valve that — (i) is between the pipeline pig launcher and the pipeline meter station; and (ii) is the first shut down valve downstream of the connection to the 150 mm pipe from the filter separator. |
Dongara | In respect of the pipeline that is the subject of pipeline licence PL1 under the Petroleum Pipelines Act 1969 of Western Australia — (a) the upstream flange of the flange joint at the inlet end of the isolating valve that is at the inlet to the pipeline inlet gas flow meter. |
Beharra Springs | In respect of the pipeline that is the subject of pipeline licence PL18 under the Petroleum Pipelines Act 1969 of Western Australia — (a) the upstream flange of the insulated flange joint that — (i) is immediately upstream of the first barred tee downstream of the pig launcher; and (ii) is on the through line of the tee. |
Griffin | In respect of the pipeline that is the subject of pipeline licence PL19 under the Petroleum Pipelines Act 1969 of Western Australia — (a) the downstream flange of the flange joint that connects the 200 mm Griffin Gas Header pipe with the 200 mm pipe connecting with the 250 mm pipe to the pipeline meter station. |
The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.