Line of Tilley to Karara Railway
Schedule 1 Line of Tilley to Karara Railway
[s. 3]
1. The Tilley to Karara railway commences about 336.5 kilometres along the Avon Yard to Mullewa Railway line at point 1 in the sequence specified in the Table then continues, generally in an easterly or south‑easterly direction, along a straight line between each of the points in the sequence, and terminates at point 10, about 74 kilometres from point 1.
Table
Point no. | East | North |
|---|---|---|
1 | 404000 | 6773000 |
2 | 418900 | 6773000 |
3 | 420000 | 6773700 |
4 | 423803 | 6774160 |
5 | 428775 | 6770355 |
6 | 443240 | 6770410 |
7 | 450215 | 6772010 |
8 | 467440 | 6771655 |
9 | 471475 | 6772630 |
10 | 474220 | 6771125 |
2. The course to be taken by the railway is shown as a red line on Public Transport Authority Plan 17‑C‑15‑1001.
Note for this Schedule:
Coordinate references are to Map Grid of Australia 1994 grid coordinates in Zone 50 of the Universal Transverse Mercator Grid System based on the Geocentric Datum of Australia.
The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.