Offence—prime contractor—duties in relation to hose assembly
126 Offence—prime contractor—duties in relation to hose assembly
A prime contractor commits an offence if the contractor—
is engaged in the bulk transfer of dangerous goods; and
fails to ensure that any hose assembly that is used, or that is intended to be used, for the transfer of the dangerous goods (other than a hose assembly for which the prime contractor is not responsible)—
has been constructed, assembled and maintained in accordance with the ADG code, chapter 10.1; and
has been inspected and tested at the intervals, and in the way, required under the chapter; and
satisfies each test under the chapter.
Maximum penalty: 20 penalty units.
An offence against this section is a strict liability offence.
Sign in to see bill, explanatory material, and regulations and instruments
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.