128
In forceOffence—prime contractor—fail to keep records
Chapter 12Bulk transfer of dangerous goods
Part 12.2Equipment and transfer
128 Offence—prime contractor—fail to keep records
(1)
A prime contractor commits an offence if the contractor—
(a)
is engaged in the bulk transfer of dangerous goods; and
(b)
fails to keep, in accordance with the ADG code, section 10.1.3.4 accurate records of all maintenance work, and each inspection and test, carried out on any hose assembly that is used, or that is intended to be used, for the transfer of dangerous goods (other than a hose assembly for which the prime contractor is not responsible).
Maximum penalty: 10 penalty units.
(2)
An offence against this section is a strict liability offence.
Sign in to see bill, explanatory material, and regulations and instruments
Research tools for this sectionSubscription
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.