Care to be taken
34M Care to be taken
In the exercise of a power under this Division, an authorised officer must do as little damage as possible.
As far as practicable, entry onto fenced land must—
be made through an existing opening in the enclosing fence, or
if entry through an existing opening is not practicable—through a new opening.
A new opening made under this section must be properly closed when the need for entry ends.
If, in the exercise of a power under this Division, a pit, trench, hole or bore is made, the Authority or the ETNO must, if the owner or occupier of the land requires—
fence the pit, trench, hole or bore, and
keep the pit, trench, hole or bore securely fenced for as long as it remains open or not sufficiently sloped down, and
without unnecessary delay, fill up, level or sufficiently slope down the pit, trench, hole or bore.
This Act’s bill:Explanatory memorandumSecond reading speech
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.