Survey certificate
CurrentSurvey certificate
Schedule 6Pond-based and tank-based aquaculture
Part 2Extensive pond-based aquaculture
Division 2Operational requirements
Survey certificate Survey certificate
In order to ensure compliance with approved plans, a survey certificate, to Australian Height Datum, must be prepared by a registered surveyor, as follows—
(a)
on completion of floor slab framework before concrete is poured, detailing the location of the structure to the boundaries, and
(b)
at completion of the lowest floor, confirming that levels are in accordance with the certificate. (Levels must relate to the datum on the certificate.)