Barrister AI
Section 4 — It is not necessary for a plan referred to in item 3 to define precisely the site of an easement intended to be created in respect of an existing tunnel, pipe, conduit, wire or other similar object which is underground, or is within or beneath an existing building, so long as the plan shows the approximate position of the easement. — Real Property Regulation 2019 (New South Wales) — Barrister AI