Development provisions for corridor
8 Development provisions for corridor
The Planning Scheme under the Planning Act 1999 is to be taken to include development provisions applying to the corridor and additional land and, subject to this section, the Planning Act 1999 (except Part 6) applies accordingly.
The Planning Minister is the consent authority for the corridor and additional land.
The development provisions under subsection (1) allow the use and development of the corridor and additional land for the purposes of construction, operation and maintenance of the following without the consent of the consent authority:
railway track;
bridges, tunnels, earthworks and other structures to support railway track;
drainage works;
turkeynest dams;
water extraction facilities;
signalling and other communication systems;
power lines;
airstrips;
construction camps but only during the construction of the railway;
temporary office and residential accommodation but only during the construction of the railway.
The development provisions under subsection (1) allow any other use or development of the corridor or additional land only with the consent of the consent authority, including the construction, operation and maintenance of the following:
railway sleeper manufacturing plants;
facilities for the embarkation and disembarkation of passengers;
facilities for the loading and unloading or storage of goods;
facilities for maintaining rolling stock;
facilities for the control of trains;
construction camps to which subsection (3)(g) does not apply;
office and residential accommodation to which subsection (3)(h) does not apply.
Division 2 of Part 5 of the Planning Act 1999 does not apply in relation to a development application in respect of the corridor or additional land unless the Planning Minister determines that, in the circumstances of the particular application, it is appropriate for that Division to apply.
Despite any development provisions in force under the Planning
Act 1999 immediately before the commencement of this section, the use, operation and maintenance of the railway (including fixed railway infrastructure and other buildings or structures in existence, and works being carried out, immediately before the commencement of this section) are to be taken to be existing uses of and works in relation to the corridor under Part 4 of the Planning
Act 1999.
The Planning Minister may, by notice in the Gazette, declare that this section applies in relation to land additional to the corridor that is specified in the notice.
Neither a declaration under subsection (7) nor anything done in relation to land the subject of a declaration under subsection (7) creates, or has the effect of creating, a subdivision within the meaning of the Planning Act 1999.
The development provisions under subsection (1) prevail over any other development or other provision under the Planning Scheme or a provision of the Planning Act 1999, whether the provision was in force before or after the commencement of this section.
In this section, Planning Minister means the
Minister for the time being administering the Planning Act 1999.
Sign in to see bill, explanatory material, and regulations and instruments
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.