Requirements for measurement scheme
61 Requirements for measurement scheme
For the 2004 Act, section 637(1)(d), a meter that measures more than 25m3 of petroleum or fuel gas in an hour must be replaced or tested at least once every 10 years.
For the 2004 Act, section 637(1)(k), if a measurement of petroleum or fuel gas is to be converted into another form of measurement under a measurement scheme, the scheme must state the method for converting the measurement.
For this section—
form of measurement means any of the following—
a measurement of the energy of the petroleum or fuel gas;
a measurement of the mass of the petroleum or fuel gas;
a measurement of the volume of the petroleum or fuel gas.
Sign in to see bill, explanatory material, and regulations and instruments
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.