Days with river-forming flow periods
5 Days with river-forming flow periods
An environmental flow objective for surface water to which this plan applies is that at each node stated in column 1 in the following table the performance indicator mentioned in subsection (2) must be at least the percentage, of the total number of days in the simulation period, that is stated in column 3 of the table opposite the node.
The performance indicator is the total number of days in river-forming flow periods.
In this section—
river-forming flow period, for a node, is a continuous period—
that is during the simulation period; and
during which daily water flows at the node are more than the daily bank full flow volume stated in column 2 of the table opposite the node.
| Column 1Node | Column 2Daily bank full flow volume (ML) | Column 3Percentage |
| 2 | 36,461 | 0.7 |
| 6 | 6,800 | 0.23 |
| 7 | 708 | 4.5 |
| 9 | 1,123 | 1.6 |
| 10 | 20,045 | 0.18 |
| 11 | 94,003 | 0.09 |
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.