Days between floodplain inundation periods
6 Days between floodplain inundation periods
At each node stated in the following table, the total number of days in all floodplain inundation periods must be no more than the percentage, of the total number of days in the simulation period, that is stated for the node.
In this section—
floodplain inundation flow means a daily water flow at the node that has a 20% probability of being reached at least once a year.
floodplain inundation flow period means a continuous period of more than 4 years, during the simulation period, in which daily water flows at the node are no more than the floodplain inundation flow.
| Node | Environmental flow objective |
|---|---|
| D | 80.3% |
| E | 86.6% |
Sign in to see bill, explanatory material, and regulations and instruments
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.