Schedule 11A
In forceMeasurement requirements— information about water taken
Schedule 11A Measurement requirements— information about water taken
section 111
| Table 1—Requirements | ||
| Column 1 | Column 2 | Column 3 |
| Information to be given | When information to be given | Way information to be given |
| details of the following for the works through which the water is taken—(a)the works;(b)each measurement device attached to the works;(c)each other relevant authorisation held by the holder under which water is taken using the works;(d)each other person who takes water using the works | within 20 business days after each time the measurement device attached to the works is inspected under section 121B | in the approved form |
| details of each change to any of the following for the works through which the water is taken—(a)the works;(b)the relevant authorisations held by the holder under which water is taken using the works;(c)the persons who take water using the works | within 10 business days after the change | in the approved form |
| the reading from a meter, or record made by a telemetry device, attached to the works through which the water is taken at each time the meter or telemetry device is replaced | within 10 business days after the replacement | in the approved form |
| the reading from a meter, attached to the works through which the water is taken, of water taken in each water period stated in table 2 for the authorisation | within 10 business days after the water period ends | in the way stated in the measurement standards |
| the record made by a telemetry device, attached to the works through which the water is taken, of water taken in each day | at the end of the day | in the way stated in the measurement standards |
| Table 2—Water periods for relevant authorisations | |
| Column 1 | Column 2 |
| Relevant authorisation | Water period |
| relevant authorisation for taking water in any of the following areas—(a)the Border Rivers Alluvium (deep) underground water sub-unit under the Water Plan (Border Rivers and Moonie) 2019;(b)the Central Condamine Alluvium underground water sub-area under the Water Plan (Condamine and Balonne) 2019;(c)the Coastal Burnett groundwater management area under the Water Plan (Burnett Basin) 2014;(d)the Don and Dee groundwater sub-area under the Water Plan (Fitzroy Basin) 2011 | both of the following—(a)the period from 1 July of a year to 1 March of the following year;(b)the period from 1 July of a year to 30 June of the following year |
| relevant authorisation for taking water in the Dawson Valley water management area under the Water Plan (Fitzroy Basin) 2011 | the period from 1 October of a year to 30 September of the following year |
| relevant authorisation for taking water in the Lockyer Valley groundwater management area under the Water Plan (Moreton) 2007 | the period from 1 July of a year to 30 June of the following year |
| relevant authorisation for taking water in the Bowen underground water area on plan CAS3065 | both of the following—(a)the period from 1 April to 1 November of a year;(b)the period from 1 April of a year to 31 March of the following year |
| relevant authorisation not otherwise mentioned in this table | the period from 1 July of a year to 30 June of the following year |
Research tools for this sectionSubscription
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.