Dictionary
Schedule 19 Dictionary
section 3
ADITC...
amalgamation, for part 4, division 3, see section 33.
amendment, for part 4, division 3, see section 33.
AMTD means the adopted middle thread distance which is the distance in kilometres, measured along the middle of a watercourse, that a specific point in the watercourse is from the watercourse’s mouth or junction with the main watercourse.
announced entitlement see section 29.
annual entitlement see section 30.
approved meter...
associated document, for a compliance certificate for a measurement device, for part 11, see section 103.
authorisation means a water licence, water permit, water allocation or other authority to take or interfere with water under the Act.
authorised meter validator...
Border Rivers Alluvium (deep) means the underground water sub-unit with that name under the Water Plan (Border Rivers and Moonie) 2019.
bulk water supply authority means the Queensland Bulk Water Supply Authority under the South East Queensland Water (Restructuring) Act 2007, section 6.
bulk water supply system, for part 6, see section 77.
camp means a camp, with an area of no more than 1ha, that does not accommodate more than 60 persons at a time.
category 1 levee see section 101(2).
category 2 levee see section 101(3).
category 3 levee see section 101(4).
cessation date...
cessation notice...
class...
class A tenure, for part 7, see section 87A(1).
class B tenure, for part 7, see section 87A(2).
class C tenure, for part 7, see section 87A(3).
closing day, for a tender, see section 17(3)(f)(i).
compliance certificate, for a measurement device, for part 11, see section 103.
continuing interim water allocation, see section 132(1).
critical distance, of a non-stock or domestic water bore in a an underground water area mentioned in schedule 17, part 2, column 1, from—
a boundary of a parcel of land—see section 140(2); or
a watercourse—see section 140(3); or
another water bore—see section 140(4).
DICAT course, for part 12, see section 124(2)(c)(i)(A).
duly qualified person, for part 11, see section 104.
education premises purpose, for schedule 11, means supplying non-potable water to premises used solely for education or training purposes.
excavation means a cavity, of a capacity of more than 2 megalitres, in the surface of land that—
is open: and
results from digging or scooping out material; and
exposes the water table at its intersection with the upper zone of saturation.
exempt bore means—
a water bore used for monitoring—
the physical characteristics of an aquifer: or
the physical, chemical or biological characteristics of water in an aquifer; orExamples of physical characteristics of water—
standing water level, water discharge rate, water pressure
for taking or interfering with water that is not Great Artesian Basin plan related water—any of the following—
a water bore for testing the water production capacity, water production quality or hydraulic properties of an aquifer;
a water bore for taking water for stock or domestic purposes;
a non-stock or domestic water bore constructed, erected or installed in an underground water area mentioned in schedule 17, part 2, column 1, but not within the critical distance from a boundary of a parcel of land, a watercourse or another water bore;
a replacement water bore.
existing authorisation see section 44(1).
existing levee see section 1247(2) of the Act.
faulty, in relation to a measurement device, for part 11, see section 105.
faulty meter...
faulty period, for a faulty measurement device attached to works through which water is taken under a relevant authorisation, for part 11, see section 103.
Great Artesian Basin plan related water means—
water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies, other than the water in—
the Betts Creek beds groundwater unit; and
the Cape Rolling Downs groundwater sub-area; and
the Normanton groundwater area; and
the Winton Mackunda groundwater unit; and
water that is accessible by drilling through water mentioned in paragraph (a).
interested entity, for part 4, division 3, subdivision 2, see section 34(3)(b)(i).
levyable mining tenure, for part 7, see section 87A(4).
measurement standards, for part 11, see section 103.
meter...
meter notice...
meter use charge...
minimum operating level, for part 6, see section 77.
modify, for an existing levee, means any or all of the following—
to raise or lower the height of the levee;
to extend or reduce the length of the levee;
to make another change to the levee that affects the flow of water.
new licence, for part 4, division 3, see section 33.
nominal entitlement see section 28.
non-residential water use, for part 6, see section 77.
non-stock or domestic water bore means a water bore for taking water for a purpose other than a stock or domestic purpose.
non-urban metering standard...
NUDLC, for part 12, see section 124(2)(a)(i).
office income statement, for part 7, see section 85.
office’s estimated costs, for part 7, see section 85.
office’s estimated mining costs, for part 7, see section 88A(b).
office’s estimated petroleum costs, for part 7, see section 88A(a).
original licence...
part A, for water charges mentioned in schedule 14, means the amount payable for each megalitre of nominal entitlement.
part B, for water charges mentioned in schedule 14, means the amount payable for each megalitre of water taken up to the annual entitlement.
prescribed activity means an activity mentioned in schedule 3 for a general authorisation to take water.
priority notice see the Land Title Act 1994, section 139(1).
public amenity purpose, for schedule 11, means taking water to operate public toilets, showers or laundry rooms.
Queensland Government business and industry portal...
relevant date, for part 7, see section 85.
relevant management area...
relevant person...
relevant sub-block, for part 7, see section 87(1).
relevant watercourse means any of the following—
Cattle Creek;
Finch Hatton Creek;
McGregor Creek;
Owen Creek;
Sandringham Lagoon.
repealed regulation means the Water Regulation 2002.
replacement water bore means a water bore that—
is constructed, installed or erected—
to replace a water bore (the previous bore) used for the taking of, or interfering with, water—
for which a development permit was held or, under section 1048A of the Act, was taken to be held; or
for which a development permit was not required; or
which, under the repealed Sustainable Planning Act 2009, section 681(1), was taken to be a lawful use of the premises in which the previous bore was constructed, installed or erected; and
within 10m of the location of the previous bore; and
taps the same aquifer tapped by the previous bore.
residential water use, for part 6, section 77.
resource project, for part 7, see section 85.
SEQ water security program, for part 6, see section 77.
settlement notice means a settlement notice under the Land Title Act 1994, part 7A.
south-eastern groundwater units and groundwater sub-areas, in relation to the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017, means—
the Mulgildie North Hutton groundwater unit under that plan; and
the following groundwater sub-areas under that plan—
• Crows Nest Marburg
• Crows Nest Woogaroo
• Eastern Downs Marburg
• Eastern Downs Precipice
• Eastern Downs Springbok Walloon
• Gatton Esk Road Marburg
• Gatton Esk Road Woogaroo
• Mulgildie North Precipice
• Mulgildie South Precipice
• Murphys Creek Marburg
• Murphys Creek Woogaroo
• Redbank Creek Woogaroo
• Southern Clarence Moreton Marburg
• Southern Clarence Moreton Walloon
• Southern Clarence Moreton Woogaroo.
standard terms document see the Land Title Act 1994, section 168.
sub-block, for part 7, see section 85.
Suncorp Metway Ltd business banking variable lending base rate means the variable base interest rate set by the Suncorp Metway Bank for loans to business entities.
supplemented water means water supplied under an interim resource operations licence, resource operations licence or other authority to operate infrastructure.
surface water means water in a watercourse.
telemetry device means an electronic device that records information received from a device that measures or records water volume or the level of water held in storage, and transfers the information to another device or thing.
transfer, for part 4, division 3, see section 33.
transfer notice, for part 4, division 3, see section 37(2).
unamended Act means the Act as in force immediately before the commencement of section 1250 of the Act.
validation certificate...
validation inspection...
water entitlement database means a database kept by the chief executive containing details of water entitlements.
water licence, for sections 28, 29 and 30, means a water licence not managed under a water management protocol.
water management area see section 137.
works...
The statute text is free to read above. View subscription options to unlock the case-law research tools for each provision.