s 18

Further information

In force
Part 2Building and demolition permits
Division 2Applications for building or demolition permits

18 Further information

(1)

A permit authority to which an application is made may require the applicant to give the permit authority, within a specified time of not more than 21 days, any document or information that it requires to determine the application and may require the applicant to verify the information by statutory declaration.

(2)

The permit authority may refuse to consider an application if the applicant does not comply with a requirement under subsection (1) within the specified time.

(3)

A requirement under subsection (1) must be given in the prescribed manner.

(4)

The regulations may provide for how many separate requirements under subsection (1) may be made in relation to an application.

(5)

A requirement under subsection (1) may be in respect of a document or information required by the building surveyor to whom the permit authority has referred an uncertified application.

[Section 18 amended: No. 37 of 2012 s. 31.]