reg 7
In forceDrainage or discharge from a slaughterhouse
Part 4Drainage and the collection of waste materials
7 Drainage or discharge from a slaughterhouse
(1)
An operator must ensure that the drainage system from the slaughterhouse at the abattoir to the waste water treatment system does not become blocked with solids.
(2)
An operator must ensure that water from the floors of the slaughterhouse is treated by means of a bucket trap, save-all, screen, or other device to remove solids, greases, and oils in or from the water before the water is discharged into the waste water treatment system.
Research tools for this sectionPro
The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.