reg 8
In forceDrainage of floors of bleeding area
Part 4Drainage and the collection of waste materials
8 Drainage of floors of bleeding area
The owner of an abattoir to which these regulations apply (other than an existing facility) must ensure that the perimeter of the floor of the bleeding area of a slaughterhouse is constructed so as to ensure that blood or other liquid is removed from the area by drains or dedicated collection devices.
Research tools for this sectionPro
The statute text is free to read above. View Pro plans to unlock the case-law research tools for each provision.